Steelfab, Inc. banner

2nd Shift Welder- Spokane, WA

Steelfab, Inc.

The Role

Overview

Welding and fitting metals using FCAW, reading blueprints, and operating related equipment.

Key Responsibilities

  • air arc
  • weld symbols
  • propane heater
  • stud welder
  • machine setup
  • air chipper

Tasks

-Operate air arc to remove steel (back gouging). -Read weld symbols and check weld size using weld fillet gauges. -Use natural gas propane heaters to pre-heat steel. -Operate stud welder. -Set machines according to procedure charts. -Follow weld procedures as it applies to volts, amps & wire feed speed. -Heat material to required temperature using temperature sticks and heating torch/cutting torch. -Use air chipper to chip of slag.

Requirements

  • pre-heat
  • angle grinder
  • fcaw
  • 2g test
  • welding
  • grinding

What You Bring

-Heat, straighten and be able to know when to use pre-heat to offset distortion. -Grind with 90° angle grinder. -Perform FCAW (2G) welding. Be able to pass 2G test in FCAW on 1" thick coupon.

The Company

About Steelfab, Inc.

-Serving sectors from industrial and commercial to government and energy, it’s tackled projects including stadiums, medical centers, and university buildings. -With roots in structural and miscellaneous metals, it adds sub-specialisms like BIM, connection design, and pre-construction planning. -Typically partnering on landmark projects—soccer stadiums, museums, chemical plants—it blends scale with precision. -Its narrative is one of steady growth, engineering depth, and a reputation for on‑time delivery and quality craftsmanship.

Sector Specialisms

Retail

Industrial

Commercial

Institutional

Manufacturing

Warehousing