Performs control valve, flow element and thermowell sizing calculations.
Preparation of Instrument Installation Details, Bulk Material Take off and assist designers in Modelling of instruments, junction boxes and allocation of Remote I/O’s and Cross wiring between DCS.
Preparation of DCS logics and SAMA diagrams of various systems (HRSG, Steam and Gas turbine , Main steam, feedwater, condensate, Protection logics, Instrument Air/Primary Air, wastewater, Circulating water, Raw water, Potable water, Electrical systems, Diesel generator, Air removal etc.)
Preparation of Technical Specification, Technical interrogatives, Technical Bid, Analysis (TBA) of the various Supplier's offers for various instruments like: Transmitters, Temperature Elements, Mass flow meters, etc.
Developing and reviewing IO database for HRSG and BOP systems including interfaces with Combustion turbine and Steam turbine
Preparation of Level Sketches and Cable Block Diagrams.
Preparation of datasheets of various commodities like Pressure, Flow, Level, Temperature or any other Miscellaneous items, Control valves , ON/Off valves, Steam turbine Bypass valves and Motor Operated Valves
Designing of severe service control valves, pressure regulating and de-superheating station control valves and desuperheaters
Maintains contact with the immediate work group or discipline and interfaces with other disciplines as specifically directed.
Receives technical and administrative supervision from Engineering Group Supervisor/Project Engineer/Project Engineering Manager
Provide technical direction as appropriate to drafters, technicians and GETs and Junior Engineers who perform specific design support assignments.
Preparation of Design Criteria for Controls and Instrumentation.
Development and Review of P&IDs
Preparation of Material Requisition and vendor print review of control system commodities (like Flow, level, pressure, temperature etc.)
Preparation of Instrument Index, Data Sheet, Wiring and Loop Diagrams in SPI.
Assists in developing or reviews discipline material quantity estimates.
Design and procurement of Continuous Emission Monitoring Systems(CEMS) and Steam and Water Analysis Systems (SWAS)
Preparation of Bill of material for commodities like fittings, tubing, Instrument enclosures (freeze protection)
Preparation of Instrumentation Specification for Mechanical Packages
Preparation of Complex Loop Control Narratives, Cause and Effect Matrix for Process and F&G System, logic narratives.
Designing steam systems (main steam (HP), cold reheat, hot reheat, LP steam and auxiliary steam), feedwater, condensate, condenser circulating water and closed cooling water system
Review of vendor prints for various vendor packages (HRSG, ST, GT, Main steam, BFW /condensate pumps)
Requirements
b.tech
dcs
plc
scada
energy management
16+ years
B.Tech in Instrumentation & Control from a recognized university.
Thorough knowledge of discipline engineering techniques, the design of engineered systems, and engineering and design calculations.
Design experience or Basic knowledge of DCS / PLC and SCADA Networks, Fiber optic and CAT 6 is essential.
Basic skills in oral and written communication.
Broad knowledge of the application of engineering to plant constructability as applied to construction methods and materials.
Working knowledge on design, digital solutions and automation of Energy Management Systems (EMS), Battery Energy Storage Systems (BESS), Fuel Cells and Hydrogen, and Aeroderivative Gas Turbines is preferred.
DCS FAT participation and knowledge of DCS systems
Understands the standard engineering work planning, scheduling and cost estimating.
Job knowledge of various types of field Instrumentation, DCS, PLC, Hazardous areas is essential.
Basic technical knowledge of Control System engineering in Power Industry.
Basic awareness industry standards Application Programs such as SPI, S3D, Flowell, Instroke, Conval ….
Basic awareness of industry or regulatory standards and design criteria pertinent to the particular engineering discipline.
Level 2 - 16+ years of industry experience.
Understanding of industry regulatory codes and standards like ISA, ASME PTC, ISO, ASME, ANSI etc. as applicable to power industry
The Hoover Dam stands as a landmark of early infrastructure innovation and engineering prowess.
560 vessels
WWII Shipyard Production
During WWII, the firm produced over 560 ships, significantly contributing to the war effort.
$17B
Annual Revenue
Operating at a scale of over $17 billion annually, it ranks as a major player in the construction industry.
25,000+
Global Projects Completed
Across 160 countries and all seven continents, the firm has delivered tens of thousands of infrastructure solutions.
The firm began building railroads and dams in the American West and grew into a pioneer of mega-projects.
Post-war, it laid massive pipelines across the Middle East and ventured into nuclear power, building the USA’s first commercial plant.
Its projects include Boston’s complex “Big Dig” tunnel, the Channel Tunnel, and Intel megafab campuses.
It operates in global markets across Energy, Infrastructure, Manufacturing & Technology, Mining & Metals, and Nuclear/Security/Environmental sectors.
Typical projects include highways, bridges, ports, airports, LNG plants, data-centers, environmental cleanups, and nuclear facilities.
Culture + Values
Extraordinary teams building inspiring projects.
We live for a challenge – make our customers’ ambitions a reality; adapt quickly and always look for a better way.
We do the right thing – exercise the highest level of integrity and ethics; create a positive legacy through purposeful and sustainable projects.
We take care of each other – safety and well-being above all; treat each other with the utmost respect.
We succeed together – embrace our differences, seek diverse views, and listen to understand; foster a deep sense of belonging.
We build trust – develop lasting 'One Team' relationships with our colleagues, customers, and partners; hold ourselves accountable to deliver excellence.
Environment + Sustainability
50% by 2030
Fleet Emissions Reduction
Aims to cut fleet emissions by half by 2030, targeting major Scope 1 and 2 fuel-related emissions.
Net Zero 2050
Emissions Goal
Committed to achieving net zero emissions across all Scopes by 2050.
Developing and implementing formal climate action plans on all reportable projects to reduce and manage emissions.
Testing hybrid/solar light plants, hybrid generation with energy storage, hybrid dozers/excavators, electric trucks/ATVs, and telematics to reduce idling.
Created CleanBuild™ 2.0 tool to predict project carbon footprint including embodied and operational GHG emissions.
Training global supply chain team in net-zero practices, engaging suppliers, and evaluating alternative concrete materials.
Collaborating with equipment manufacturers to accelerate next-generation hybrid and electrified construction equipment.
Participant in Corporate Coalition for Innovation & Technology toward Net Zero (CCITNZ) alongside GE, GM, Honeywell, Invenergy and others.
Inclusion & Diversity
900 Colleagues
Completed MARC Program
A large number of colleagues have successfully completed the MARC gender equity program.
150+ Participants
Women@Bechtel Conference 2022
The conference gathered over 150 in-person participants and hundreds more remotely, showcasing its global reach.
260 Female Professionals
Engineering & Safety Roles
Prominent female workforce involved in engineering and safety roles, highlighting gender diversity.
Top 100 Inclusive Workplaces
2022 Recognition
Recognized as one of the Top 100 Most Inclusive Workplaces in the U.K., reflecting strong diversity efforts.
Achieved ISO 30415 certification for Diversity and Inclusion, the first construction company in the U.K.
Participates in eight Business Resource Groups, supporting inclusivity and diversity.
Received national certification in Chile (NCh3262) for addressing gender pay gaps and workplace issues.
Launched Boundless@Bechtel in 2023 to enhance disability inclusion.