Tape Casework elevation drawings to wall at each elevation so installer has proper drawing to work from.
Determine and sign-out of all power tools, specialty tools and expendable materials for each installer.
Organize, protect and maintain materials to be installed and that are installed at the jobsite.
Being proactive by ordering expendables, installation materials for our project; weekly not daily.
Attend monthly field leader training meetings held by the General superintendent or General Manager
Walk the installation area that is in progress updating completion list for work completed.
Position is where you must always present a clean, professional appearance to our customers. You will be providing services at city and county schools, government facilities and private companies.
Notify the customer as required prior to receipt of any major delivers and arrange for staging on-site.
Attend customer’s weekly job meetings.
Maintain the standard that every task is finished 100% whenever possible; doors, drawers adjusted, all fillers, blind fillers, caulking, HRDW is installed. The area and our work must be clean, tape, shipping labels removed, shims cut, and all debris is removed, and area is swept clean.
Obtain verified field dimensions if needed with the Project Manager for use in releasing material.
Set and maintain high quality standards with all installers and carpenters.
Complete each project on time, within Labor Cost Budget and satisfy the Customer.
Follow Safety Manual and OSHA regulations.
Train installers in material handling methods.
Reviewing each building/floor for installation readiness two weeks prior to installation start date. Information to be provided to PM. Look for:
Rooms/area cleaned up from previous trades and ready for materials to be distributed and installed.
Plan or supervise unloads, (manpower and equipment). Supervise distribution of materials to the proper installation location and all the pieces are in he room ready to be installed so the installer does not look for items.
Coordinate with onsite trades as required.
Practice, teach and promote safely all day, every day.
Review Labor Cost to Complete with Supervisor to improve efficiency and cut down time/costs of installation wherever possible.
Work with Supervisor to determine anchorage method for all products using approved submittals/contract details prior to installation start-up.
Prepare a floor plan on paper showing where each major piece of equipment is sored in the building and keep updated.
Manage timecards inputs for all field personnel on your project insuring they are signed into the right project and correct work group code.
Requirements
tablets
blueprints
power tools
driver’s license
electrical wiring
bleacher
Walls primed or finish painted, or wall coverings installed.
Ceiling grid or hard ceiling installed at correct height.
Stand or walk for 8+ hours
Position requires the applicant to climb and work off scaffold or work in electric scissor lifts.