Package Lead - Rotating Equipment

Company logo
Highview Power
Develops long‑duration liquid air energy storage systems to turn excess renewables into dispatchable clean power.
Lead delivery of rotating equipment packages for Hunterston energy storage project.
7 days ago ago
Expert & Leadership (13+ years), Experienced (8-12 years)
Full Time
London, England, United Kingdom
Onsite
Company Size
56 Employees
Service Specialisms
Liquid Air Energy Storage
Grid Stabilisation Services
Renewable Energy Power Stations
Energy Storage Project Development
Engineering Consulting
Sector Specialisms
Energy
Infrastructure
Utilities
Role
What you would be doing
interface management
safety audits
pre‑commissioning
o&m documentation
quality management
risk management
  • Working with the project Interface Manager, manage key interfaces for Hunterston project between various parties and ensure effective and consistent communication take place between suppliers and that required input is provided in a timely manner.
  • Participate in (and provide assurance) safety audits, design reviews, subcontractor's performance assessment, site readiness reviews, safety risk assessments, HAZIDs and HAZOPs as practically possible and ensure that all actions are registered and closed and signed off
  • Complete and hand over the mechanically complete and pre-commissioned delivery scope to commissioning /Operations confirming its suitability for commissioning and entry into service, together with clear definition of operating limits and guidance on inspection, maintenance and repair
  • Manage the delivery of O&M documentation
  • Work Closely With Project Services to ensure that related cost and schedule are adhered to
  • Manage any change of scope, address design, contractor scope, cost and schedule issues early and in a fully documented way
  • Review of vendor technical proposals to ensure they are appropriate and comply with our requirements. Identify areas for improvements, cost reductions, increases in efficiency etc.
  • Work with Quality Assurance Manager to develop and drive Quality Management Process for Carrington, ensuring contractor compliance and acceptance of products and services supplied
  • Maintain an open dialogue with the Ops team
  • Identify and manage related risks to the scope of work
  • Work with PSCM on managing contractor performance and developing KPI'S for the area of responsibility
  • Lead on the design and delivery of the mechanical technology packages as an input to deliver the full Hunterston facilities scope, identifying gaps and work to close them. Manage the suppliers to ensure that delivery is in line with project requirements
What you bring
meng
autocad
cadworx
pdms
3-5yrs
excel
  • Have good attention to detail
  • MEng Degree or equivalent qualification in Mechanical Engineering
  • Sound report writing skills and ability to prepare, comprehend and communicate engineering and technological documents
  • CAD modelling experience (AutoCAD/BricsCAD)
  • Experience in power, industrial gases, oil & gas or other process industry an advantage
  • Ability to communicate effectively both orally and in writing.
  • High level of integrity and diplomacy
  • Minimum 3 - 5 years' experience
  • 3D plant CAD modelling experience (CADWorx, PDMS)
  • Experience in static and rotating equipment an advantage
  • Genuine interest in the environment, sustainability and renewable energy
  • Experience in HSE reviews, such as HAZID and HAZOP an advantage
  • Experience working on projects relating to energy or energy storage industry an advantage
  • Field experience on construction or operational site an advantage
  • Microsoft Office proficiency (Excel & Word)
Benefits
  • Group Life Insurance
  • Cycle to work loan
  • Season ticket loan
  • Discretionary annual salary review
  • Learning & Development opportunities
  • Income Protection
  • 25 days annual leave
  • Benefits HUB - discount portal
  • Private Medical Insurance
  • Competitive salary & discretionary bonus
  • Auto enrolment in pension following 3 month's service
Training + Development
Information not given or found
Company
Overview
2005
Founded
The company was established in 2005 as a pioneering force in energy storage technology.
£300m funding
Raised Investment
The company secured £300 million in funding from key investors including the UK Infrastructure Bank and Centrica.
50MW/300MWh
Energy Storage Plant
A utility-scale energy storage plant capable of delivering 50MW power with 300MWh storage capacity.
400MWh
US Energy Project
A large-scale energy storage project with a 400MWh capacity in Vermont, United States.
  • It pioneered liquid-air energy storage, offering utility-scale solutions without geographic limits.
  • Its proprietary CRYOBattery™ tech liquefies excess renewable power, storing it cryogenically for hours or days of dispatch.
  • Projects span from UK demonstrators to planned multi-gigawatt schemes in Australia and across the UK.
  • Systems deliver grid services like inertia, peak shaving, black-start, frequency support, and renewable firming.
  • With modular tanks and mature components, its storage scales cost-effectively and rivals battery and thermal baseload performance.
  • A standout: zero-emission, zero-water, non-chemically-based tech boasting a 30–40 year lifespan and half the LCOE of lithium batteries.
Culture + Values
17 Years Invested
Long-term commitment to innovation
Demonstrates a dedication to developing proprietary LAES technology over an extended period, reflecting innovation and perseverance.
Multi-GWh Storage
Large-scale project delivery
Indicates expertise in executing ambitious energy storage solutions, showcasing technical capability and scalability.
Multi-hundred MWh Duration
Energy storage capacity
Evidences the ability to deliver长时间 energy storage solutions, highlighting technical innovation and practical application.
6 Countries Operated
Global expansion strategy
Reflects a strategic focus on international growth and market presence, establishing a global footprint.
  • No explicit publicly stated ‘official’ culture or values found on Highview Power’s website or LinkedIn.
  • Strategic partnerships with UK Infrastructure Bank, Centrica, Sumitomo, Rio Tinto, Goldman Sachs, KIRKBI, Mosaic, etc., indicating a collaborative and investment-attractive culture.
  • Delivery of multi-GWh / multi-hundred-MWh storage projects, evidencing an execution-oriented, results-driven environment.
Environment + Sustainability
£300M Investment
CRYOBattery Project
First UK commercial-scale CRYOBattery plant (50 MW/300 MWh) financed and under construction for operation early 2026.
10% Target
UK LDES Contribution
Developing four 2.5 GWh plants by 2030, contributing over 10% of UK long-duration energy storage targets.
2GW Pipeline
LAES Capacity
Program pipeline includes over 2 GW lithium-ion free energy storage capacity by 2035, supporting ~7.6 million homes.
£9B Infrastructure
Investment Over 10 Years
Planning over £9 billion in infrastructure investment over 10 years, supporting over 6,000 jobs.
  • Net zero target to enable a zero‑carbon electricity grid by 2030 (UK Future Energy Scenarios) via long‑duration energy storage
  • Technology stores energy for weeks, lower levelized cost than lithium‑ion, zero emissions, zero water impact, providing grid stability and synchronous inertia
Inclusion & Diversity
  • No DEI strategy or gender‑specific data found on Highview Power’s public website or LinkedIn
Big Kablio Logo
Kablio AIIf you're someone who helps build and power the world (or dreams to), Kablio AI is your pocket-sized recruiter that gets you hired.
Copyright © 2025 Kablio