Light Grey Kablio Logo
Atkinsréalis

Lead Project Controls Manager - EPCM Delivery

Company logo

Atkinsréalis

A global engineering & nuclear services firm delivering end‑to‑end infrastructure and energy solutions.

Lead Project Controls Manager overseeing EPCM delivery for a Nevada greenfield mining project.
12 days ago ago
Experienced (8-12 years), Expert & Leadership (13+ years)
Full Time
Reno, NV
Onsite
Company Size
40,000 Employees
Service Specialisms
Architectural Design and Engineering
Civil Design and Engineering
Structural Design and Engineering
Electrical Design and Engineering
Mechanical Design and Engineering
Transportation planning
Highways and bridges
Railroads and transit
Sector Specialisms
Water
Environment
Education
Aerospace
Security
Defence
Communications
Infrastructure
Role

Description

master schedule
document control
pmis implementation
cost control
risk register
change log
  • Schedule Management – leads the preparation of the Integrated Master Schedule (IMS) and works with project stakeholders to collect the required information. For areas where the information needed is not available makes and documents reasonable assumptions.
  • Document Control – works with the Document Controls team to implement processes to manage the project information in the project management information system deployed for the project.
  • Leads the development and execution of the Project Controls Plan for the project. Acts as main point of contact with the Owner, Designer, and other stakeholders for all Project Controls related matters.
  • Reporting – leads the preparation of project statis reports that include cost, schedule, risk, quality, earned value, change management information for different levels of stakeholders, including Regulatory Agencies.
  • Risk Management – leads risk identification meetings and the creation of a risk register for the project. Works with project stakeholders to develop risk responses and monitors the risks throughout the duration of the project.
  • Change Management – initiates and maintains a Change Management Log. Works with different stakeholders to obtain required approvals to implement changes. With support from the cost estimating team review contractors’ change order requests and recommends approval to Client or Director.
  • Cost Management – leads the development of the project WBS and List of Control Accounts. Works with the Accounting Team to set up the project in the ERP. Works with the project team to ensure actual costs are allocated to the correct tasks. Reviews contractor and vendor payment applications and invoices for accuracy and compliance with Contract requirements.
  • Project Management Information System (PMIS) – works with the Owner and other stakeholders to develop a detailed list of requirements for implementation of the PMIS and oversees the implementation to be performed by our Digital Team. Evaluates progress, functionalities, and manages the roll out to the project team, including coordinating necessary training and onboarding of new staff.
  • Manages the work of other cost analysts, quantity surveyors and schedulers assigned to the project. The work includes recruiting, onboarding and managing the performance of all project controls staff assigned to the project, including staff assigned to the project by contractors and vendors.
  • Contracts Management – makes recommendations on contract strategies for the procurement of goods and services needed for the project. Supports the development of RFP packages and proposal evaluation representing the Project Controls Team.
  • Defines key project controls processes required for EPCM Delivery and develops detailed procedures and guidelines for the project team to implement these processes.

Requirements

primavera p6
navisworks
ms office
erp
aace
15+ years
  • Working knowledge of the following applications: ACC, Bluebeam, On-Screen Takeoff (OST), BIM360, Assemble, Primavera P6, and Navisworks.
  • Certification from AACE is desired, but not required.
  • BS in Engineering, Construction Management, Quantity Surveying, or similar field.
  • 5+ years’ experience working for a General Contractor or a Subcontractor.
  • Proficiency with MS Office Suite, including Word, Excel, Power Point, Share Point.
  • Experience with ERP software such as Oracle, SAP, Deltek Cost Point, etc.
  • 15+ years of experience as Project Manager, Cost Manager, Project Controls Manager, Project Scheduler or Cost Estimator. EPCM Experience is preferred but not required.
  • Proficiency with Power BI is desired but not required.

Benefits

Information not given or found

Training + Development

Information not given or found
Company

Overview

C$12.5B
Backlog
Record backlog amid surging demand.
113 km
Bike/Ped Facilities
It has designed an extensive network of cycling and pedestrian infrastructure.
  • Its tech‑forward Richland Technology Center supports robotics, digital and net‑zero innovation in energy and cleanup.
  • A nuclear engineering pioneer, it’s the owner’s engineer for U.S. small modular reactor projects and refurbishments.
  • A trusted tolls and highway consultant, it supports major state DOTs.

Culture + Values

  • Engineering a better future for our planet and its people.
  • Safety: We put safety at the heart of everything we do, to safeguard people, assets and the environment.
  • Integrity: We do the right thing, no matter what, and are accountable for our actions.
  • Innovation: We redefine engineering by thinking boldly, proudly and differently.
  • Collaboration: We work together and embrace each other’s unique contribution to deliver amazing results for all.
  • Excellence: We are proud to do our best, achieve high standards, creating environments where all can thrive.

Environment + Sustainability

Net-zero by 2030
Emissions Goal
Achieved a net-zero target for operational emissions by 2030, marking a significant milestone in sustainability efforts.
87% reduction
Emissions Drop
Reduced Scope 1 & 2 emissions by ~87% compared to a 2019 baseline through strategic measures like divestment and fleet electrification.
62 score
Carbon Performance
Achieved a DitchCarbon score of 62, significantly higher than the industry average of 20, ranking in the top 1% globally.
Over 50%
Sustainable Revenue
More than half of 2022 revenue came from sustainable projects, including clean energy, water sanitation, and mass transit initiatives.
  • Achieved PAS 2080:2023 certification for whole‑life carbon management in infrastructure.
  • 2022 emissions breakdown: Scope 1 (6,845 tCO₂e), Scope 2 (4,251 tCO₂e), Scope 3 (33,381 tCO₂e); Scope 1‒2 intensity at 0.3 tCO₂e/FTE.

Inclusion & Diversity

No Data Available
Gender Ratio Disclosed?
The company does not publicly share specific numerical data regarding gender ratios or other diversity metrics.
  • Corporate statement describes an 'inclusive, diverse and energized approach' and 'open culture' founded on core values.
  • Asia region emphasises sense of belonging, mutual respect, personal touch, interest groups and support for work–life balance.
  • Culture of learning highlighted through technical Lunch & Learn, case‑study sharing and virtual webinars with global mobility experiences.
Loading...