Track actual costs and provide input as needed to cost forecasts.
Mentor other Project Controls Specialist on the team.
Study and understand all relevant project documents pertaining to the preparation of plans and
Serve as a key point of contact for upper management to discuss high-visibility projects and issues.
Verbally and in writing advise management, project management and discipline personnel on impacts,
Monitor progress against project schedule and prepare progress reports.
Ensure scope of work document into logically linked resourced-loaded project schedule.
Work with all relevant project and discipline personnel to prepare plans and schedules.
Develop and/or modify Project Controls processes and working procedures based on feedback from project stakeholders and upper management.
Work is conducted in an office environment (Private or Semi-Private Office) on an active construction site.
Lead/Assist in the development of Cost and Schedule QRAs (Quantitative Risk Assessment).
Analyze progress and effects on schedule and advise necessary corrective actions.
Assist project manager to develop project scope of work.
Provide input into the budget forecasting process.
May assist as a Stage Gate Process Gate Reviewer by performing rigorous evaluations of project
Participate in schedule and project risk analysis as required.
Manage cost discipline to ensure accurate and timely control and forecasting of man‐
Work with project scheduler to prepare realistic, achievable schedules as logical networks and where necessary integrate engineering, procurement, and construction schedules.
Interaction with other team members, as well as supervisors and client personnel
Gather accurate progress and expended cost information at relevant time intervals.
Prepare, review, and ensure the timely issue of all relevant reports to stakeholders.
Requirements
primavera
excel
project controls
10+ years
cost control
bachelor's
Must understand the basic principles of project management.
Sufficient vision or other powers of observation, with or without reasonable accommodations, which permits employee to conduct analysis and investigations
Requires previous experience utilizing Primavera P6 to build schedules.
Must be able to lift and carry 5 pounds
Must be able to wear safety equipment as required by the safety department for personal protection
Ability to sit for prolonged periods of time with or without reasonable accommodation
May be required to travel out of town on a periodic basis.
May be at more than one job site in a day and must be able to tolerate climate changes
Bachelor’s degree preferred
Sufficient personal mobility and physical reflexes, with or without reasonable accommodations to perform office duties and travel when necessary to off-site locations
Prior experience in Project Generation, Oil Refineries, or Chemical Plant industries.
Requires a general understanding of Cost Management, Estimating and Change Control.
Must be a skilled writer.
Sufficient clarity of speech and hearing or other communication capabilities, with or without reasonable accommodation, which permits employee to communicate effectively
Requires (10) years of Project Controls related experience.
Must have prior cost control experience.
Sufficient manual dexterity with or without reasonable accommodation, which permit the employee to perform routine office duties
Must be able to effectively communicate with project stakeholders and upper management.
High School Diploma or the equivalent.
Requires a basic working knowledge of project management software, specifically Primavera P6 and Excel.
Requires the ability to manage multiple projects and determine priorities.
Must have a high degree of computer literacy.
Benefits
Working plant, construction, and/or shop areas around production machinery with extreme noise levels
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
no sponsorship for us work authorization is provided.
Security clearance
pre‑employment urine drug screen required; ongoing random and post‑accident testing.