Plumber

Ukse Group

The Role

Overview

First-fix copper pipe and waste pipe installation (28-35mm, 4-inch)

Key Responsibilities

  • copper piping
  • press fitting
  • first fix
  • waste pipe

Tasks

-First fix copper press pipe work ranging from 28mm to 35mm, as well as 4-inch waste pipe.

Requirements

  • plumbing tools
  • cscs
  • jib

What You Bring

-Basic plumbing hand tools (required). -CSCS/JIB (required).

Benefits

-Working hours 07:30 - 15:30, paid 10-hour day rate. -Starting Monday, 17.11, until Christmas initially - potential to stay on much longer. -£190 - £210 per day (depending on experience).

The Company

About Ukse Group

-Global provider of specialist mechanical and electrical engineering teams. -Financially resilient with significant infrastructure investments. -Offers flexible workforce packages including labour-only, labour plus plant, fixed terms, or emergency shifts. -Recognized for high-stakes projects such as waste-water treatment pipework, industrial HVAC, and healthcare facility engineering.

Sector Specialisms

Water

Power

Nuclear

Energy from waste

Food

FMCG

Industrial