Traveling Assistant Superintendent

Timberlab

The Role

Overview

Oversee construction, manage teams, schedule, safety, quality, and documentation.

Key Responsibilities

  • drawing review
  • material procurement
  • schedule management
  • quality control
  • reporting
  • team coordination

Tasks

-Review all drawings, specifications and subcontractor submittals -Order materials and tools and plan supply allotment to avoid “crisis” buying -Perform turnover to Owner and document final close-out and Owner’s acceptance -Verify subcontractor certificates of insurance -Chair or attend pre-job conference, regular subcontractor meetings -Develop Owner and Architect’s confidence -Attend and participate in Safety Training Program and enforce safety procedures -Document and complete all punch lists in a timely manner -Assure work quality - set standards for quality control -Prepare and maintain responsibility for CPM job schedule -Recruit, organize, train, direct and coordinate field construction team including subcontractor’s direct hire work -Prepare necessary reports (e.g. time sheets, work orders, daily reports and invoice approval) -Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems

Requirements

  • sts certification
  • osha
  • crafts
  • scheduling
  • general foreman
  • problem solving

What You Bring

-Current Safety Trained Supervisor (STS) Certification, or achievement of STS Certification within six months of hire, maintenance of active certification status -Knowledge of OSHA laws -Extensive field construction experience at supervisory level -Ability in problem-solving -Working knowledge of all crafts (ability to read and understand specifications for all trades), and foreman or journeyman in at least one trade -Knowledge of job scheduling, planning, expediting and cost control -Able to perform all essential General Foreman job responsibilities -2-4 years as General Foreman -Strong sense of urgency

Benefits

-Travel 100%

The Company

About Timberlab

-Broke ground in early 2025 on a 190,000 sq ft CLT plant in Millersburg, OR — one of the largest in North America. -Landmark projects include the Portland International Airport terminal, using 3.3 M board‑feet of local timber. -Specializes in engineered wood systems across design, manufacturing, procurement, and on‑site installation. -Operates coast‑to‑coast U.S. fabrication hubs with advanced CNC automation and regional supply chains.

Sector Specialisms

Commercial

Residential

Public Works

Office Development

Community Centers

Universities