
Roofer
Jrl Group Ltd
The Role
Overview
Experienced roofer for flat roofing and waterproofing on Canary Wharf project.
Requirements
- cscs card
- ppe
- flat roofing
- work permit
- nvq2 roofing
- 2 years
What You Bring
-CSCS Card Required -PPE Required -Flat Roofing, Waterprrofing. Axter -Valid Work Permit / Right to Work in UK -NVQ 2 Roofing - preferred but not essential -Minimum of 2 years experience as a Roofer -Bauder Waterproofing experience preferred but not essential
People Also Searched For
Procurement Manager jobs in Southwark , Greater London , UK
Client Account Manager jobs in Southwark , Greater London , UK
Sustainability Analyst jobs in Southwark , Greater London , UK
Procurement Manager jobs in Greater London , UK
Client Account Manager jobs in Greater London , UK
Sustainability Analyst jobs in Greater London , UK
Procurement Manager jobs in Southwark , UK
Client Account Manager jobs in Southwark , UK
Sustainability Analyst jobs in Southwark , UK
Benefits
-Ongoing work available -7:30am – 5:30pm Monday to Friday (1hr lunch break) -£22.00 per hour (10hrs paid) -CIS / UTR Payment (No Umbrella companies / fees)
The Company
About Jrl Group Ltd
-Evolved from a sub- and superstructure specialist into a multi-divisional construction powerhouse. -Operates through multiple integrated divisions, delivering turnkey solutions across the built environment, blending design, engineering, and construction. -Headquartered in Borehamwood, Hertfordshire. -Delivers turnkey solutions across the built environment, blending design, engineering, and construction. -Known for tackling challenging, high-specification assignments, especially in façade design and installation. -Maintains an entrepreneurial structure where agile divisions collaborate on large-scale built-environment schemes.
Sector Specialisms
Demolition
Piling
Groundworks
Concrete Frames
Plant Hire
Bulk Excavation
Waste Disposal
Recycling
Drylining
Technical Coordination
Architectural Design
Mechanical Ventilation Heat Recovery (MVHR)
Renewable Energy
Heating
Construction
Design
Facades
M&E (Mechanical and Electrical)
Environmental