Want to hear how I work? Hit play.Kablio AI applies for you. You just show up to the interviewKablio AI helps you secure roles in construction, clean energy, facilities management, engineering, architecture, sustainability, environment and other physical world sectors.
Get hired, get rewarded!
Land a job through Kablio and earn a 5% salary bonus.
Exclusive benefits
5%Bonus
Excavator Operator
S&B Usa Construction & Fay
Develops, finances, builds and maintains large P3 and design‑build infrastructure projects in the U.S.
Experienced excavator operator with license and safety awareness for construction projects in Chesapeake, VA.
24d ago
Experienced (8-12 years), Junior (1-3 years)
Full Time
Chesapeake, VA
Field
Company Size
800 Employees
Service Specialisms
Alternative delivery (Design‑Bid‑Build)
Design‑Build
Construction Management (CM/GC, CMAR)
Public‑Private Partnerships (P3)
Development & Financing
Self‑Performing Construction
Operations & Maintenance
Heavy‑civil infrastructure
Sector Specialisms
Heavy Civil
Industrial
Infrastructure
Marine
Utilities
Transportation
Public-Private Partnerships (P3)
Design-Build
Role
What you would be doing
task safety
equipment maintenance
direction taking
Perform tasks in a safe and accident-free manner.
Maintain equipment in proper operating condition by performing simple preventative maintenance and repair tasks.
Can take and apply direction from supervisor
What you bring
cdl a
heavy equipment
3 years exp
team environment
ppe
steep terrain
CDL Class A driver’s license preferred.
Must be able to bend, stoop, and ascend/descend to reach materials or enter heavy equipment.
Exposure to moving mechanical parts.
Applicant must be able to pass drug test and background check.
Valid Driver’s License with clean driving history.
The ability to communicate information and ideas so others will understand.
Extensive moving or positioning heavy weighted materials (up to 50 lbs.).
Workers must have reliable transportation, or be able to access jobsites in any location
Experience operating various equipment including backhoes, excavators, loaders and skid steer.
Safely and skillfully operate various equipment including backhoes, loaders and skid steers with emphasis on excavators.
Must be able to respond quickly to sounds.
Workers must provide their own safety footwear
Three years of experience required
Regularly exposed to outside weather conditions.
Able to work well in a team environment
Must be able to traverse irregular and steep terrain.
Ability to wear and work in personnel protective equipment including but not limited to hard hat, safety glasses, gloves, ankle-supporting safety-toed work boots and a safety vest.
The company was established in 2012 as the U.S. arm of a century-old global firm.
$1.2B Project Win
Major project value
Secured a $1.2 billion contract for the Fargo diversion project in North Dakota.
26+ Global Deals
Parent company's infrastructure track record
The parent company has successfully completed over 26 global infrastructure projects, including toll roads.
75+ Year Expertise
Acquired historical expertise
Gained over 75 years of experience in heavy civil projects like roads, bridges, and dams by acquiring Fay in 2019.
Fused global construction know-how with local expertise.
Pioneered a full-stack delivery model from financing to long-term asset management.
Specializes in complex P3 and design-build projects, often self-performing critical scopes like foundations and bridge work.
Typically delivers high precision engineering with strong community impact and long-term lifecycle involvement.
Unique combination of local self-performance capabilities with global finance and asset management expertise.
Culture + Values
Project Size Doubled
Average Project Growth
The average size of projects has doubled over two years, indicating significant expansion and scalability.
40% Workforce New
Recent Employee Growth
40% of the workforce has joined within the past two years, reflecting rapid growth and new opportunities for learning and advancement.
Safety is not just a priority; it's ingrained in everything we do; it's our culture.
Integrity is at the heart of our operations.
We value people, recognizing that by taking care of our employees, they in turn take care of our clients and stakeholders.
Providing solutions and fostering an entrepreneurial spirit isn't merely a goal; it's our unwavering commitment.
We embrace innovation and possess the agility to drive progress and seize new opportunities.
Sustainability is foundational to this approach, and we strive to generate enduring value while minimizing our environmental impact and positively engaging with the communities we serve.
Self-performing construction expertise through Fay, enabling career-defining experiences via mentorship, training, and support for professional licensing and certifications.
Environment + Sustainability
260,000 Residents
Protected by Flood Diversion
The flood diversion project in Fargo-Moorhead safeguards approximately 260,000 residents by employing green financing and resilience measures, designed to withstand a 100-year flood event.
80,000 Residents
Powered by Battery Storage
The Saticoy Energy Storage battery site provides clean, zero-emission energy to around 80,000 residents.
108 MW and 260 MW
Solar Assets Acquired
S&B USA Energy has acquired and operates solar assets including the Beacon II & V projects (108 MW) and the Brazoria West Solar project (260 MW).
100-year Flood Design
Resilient Flood Project
The flood diversion project in Fargo-Moorhead is designed to protect against a 100-year flood event, demonstrating a commitment to long-term resilience.
Frankie Pace Park contributes to urban tree cover, reducing the urban heat island effect.
SH-288 Toll Roads project pilot of Greenroads rating: assessed environment, water consumption, materials, utilities, access, and livability.
Global parent ISO14001 certified; adheres to green-building standards (Israeli 5281, BREEAM, LEED, Greenroads).
Policy includes reducing fossil fuel use, efficient energy and water use, minimizing waste via reuse/recycling, and using low-impact and local materials.
Intends continuous measurement, control, and improvement of environmental impact via training, stakeholder engagement, and supplier screening.
Net-zero target date: not publicly stated on U.S. site.
Inclusion & Diversity
No DEI strategy or gender‑related statistics publicly disclosed
Hey there! Before you dive into all the good stuff on our site, let’s talk cookies—the digital kind. We use these little helpers to give you the best experience we can, remember your preferences, and even suggest things you might love. But don’t worry, we only use them with your permission and handle them with care.