Translate ISO/RTO study requirements into technical guidance for product development teams.
Support modeling and validation of inverter-based PV and storage systems per ISO/RTO/utility requirements (e.g., PSCAD, PSS®E, PSLF, etc.).
Prepare and maintain technical documentation required for interconnection studies, permitting, and compliance audits.
Lead or assist customers with submission of interconnection applications for PV and Energy Storage projects under ISO, RTO, and utility-specific processes.
Support responses to regulatory inquiries, audits, and compliance filings.
Contribute to industry forums, standards committees, and working groups to shape emerging IBR regulations.
Generate regulatory compliance checklists, risk assessments, and mitigation plans for each project.
Collaborate with project engineering, development, and permitting teams to ensure project designs comply with applicable state, ISO/RTO, utility and federal requirements.
Requirements
electrical eng
grid modeling
iso/rto
ieee standards
ferc
12+ yrs
Minimum of 12 years of engineering experience and 10 years of experience with utility scale generation, in particular transmission connected PV, energy storage, and/or other IBRs, and DER.
Bachelor’s or Master’s degree in Electrical Engineering, Power Systems Engineering, or related field.
Working knowledge of FERC regulations, NERC reliability standards, PURPA, and their application.
Strong ability to interpret and communicate regulatory/technical requirements to cross-functional teams.
Experience preparing regulatory filings, compliance documentation, and technical reports.
Experience with grid modeling tools for interconnection and stability studies.
Demonstrated success with projects with various ISOs and utilities.