Act as liaison to design staff to respond to Contractors’ RFI's and review of shop drawings.
Exerts influence over and maintain excellent relationships with Contractors to maintain project goals.
Monitors Contractor performance, quality, schedule, overall responsiveness, and effectiveness.
Manage office staff responsible for record keeping, general correspondence, compiling and drafting of required reports and deliverables.
Responsible for overall site safety, permit status compliance and coordination with other agencies.
Responsible for supervising Stantec staff, including development of Management plans, tracking career progress, mentoring, advocating for and approving timesheets and training/development requests.
Provides technical review of construction plans and specifications and project changes for constructability and practicality.
Responsible for the technical supervision for the construction phase of projects. Various project types include sewer separation, stormwater pump stations (up to 50 MGD), storage tanks (up to 4 MG) and water/wastewater treatment plants.
Serve as the primary point of contact on assigned construction contracts, with primary responsibility for construction contract administration and quality management.
Manage inspection staff and the delivery of daily inspector reports in accordance with clients’ requirements.
Manages the Contractor monthly payment process and recommends appropriate adjustments as necessary to manage the Contractor.
Requirements
autocad
excel
civil eng
10+ years
osha
team management
Required software applications include: Adobe, Microsoft Excel, Word, and Project. AutoCAD experience beneficial, but not required.
Be able to manage multidiscipline design teams, with minimal supervision.
Must have good driving record and a valid driver’s license.
Familiarity with construction procedures and scheduling of work sequences. Should be familiar with dewatering, backfilling and compaction of utility trenches, pavement/surface restoration, architectural and structural construction.
Minimum of ten (10) years’ experience on projects showing increasing responsibility.
Position will work in both a field and office setting. Field work may include exposure to the elements including inclement weather. Must be available to travel for outoftown projects when needed.
Bachelor’s degree in Civil Engineering.
Must be available to travel for outoftown projects when needed.
Outstanding record of successful Water Projects – Thorough knowledge of industry codes to ensure compliance of federal and state regulations, understanding of new technologies and cuttingedge methods.
Excellent verbal and written communication skills.
CCM is preferred.
Demonstrated ability to prioritize and multitask.
Minimum of five (5) years in a construction management role of water and wastewater related projects.
OSHA training/certification and Confined Space Entry certification beneficial (or will train, if needed for an assignment).
Benefits
This position is eligible for relocation
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
Information not given or found
Company
Overview
Founded in 1954
Year Established
The company was established as a one-person environmental engineering practice in 1954.
MWH Global in 2016
Acquisition Year
Completed the acquisition of MWH Global to enhance expertise in water and natural resources.
450+ Offices
Global Presence
Operates across more than 450 offices on six continents, showcasing extensive global reach.
6 Continents
Geographic Reach
Maintains a strong presence on six continents through strategic expansion.
Began as a one-person environmental engineering practice and has grown through strategic geographic and service expansion.
Publicly listed on the NYSE and TSX, Stantec has completed major acquisitions to bolster expertise and strengthen global infrastructure portfolio.
Headquartered in the iconic Stantec Tower in Edmonton, the company has delivered landmark projects like the Panama Canal Expansion and high-profile community developments.
Leverages interdisciplinary teams of designers, engineers, scientists, and project managers.
Typical projects span urban planning, civil infrastructure, water management, environmental assessment, energy delivery, and architectural design, serving public and private sectors.
Blends technical prowess with visionary design in bold ventures such as designing its own mixed-use tower and leading multi-nation infrastructure projects.
Culture + Values
We Put People First
We Do What is Right
We Are Better Together
We Are Driven to Achieve
Environment + Sustainability
2025
Carbon Neutrality Target
The company plans to achieve carbon neutrality in its operations by the end of the fiscal year 2025.
32,000
Employees in Sustainable Projects
Over 32,000 employees are working on climate-resilient infrastructure and future-proofing cities.
Commitment to environmental, social and governance excellence across operations and client projects
Issued Sustainability‑Linked Loan, tying financing to ESG metrics including Bloomberg GEI and environmental targets