Comprehensive training opportunities Potential to progress within our organisation
Annual summer event to celebrate our anniversary
Employee Assistance Programme (EAP)
Retail discounts- Cashback on major retailers
Long Service Rewards Additional annual leave & Up to One months salary bonus
Purchase annual leave scheme
Cycle to work scheme
Health and wellbeing incentives
Employee referral scheme (£250 reward)
Competitive bonus scheme
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
Information not given or found
Company
Overview
1967
Year Founded
Established in 1967, the company has grown into a leading engineered timber manufacturer.
Operates multiple regional production sites to produce roof trusses, floor joists, panels and timber frame cassettes
Supplies both high-volume housebuilders and bespoke commercial developments across the UK
Specialises in precision-engineered components from TR26 grade Scandinavian timber, certified CE and ISO compliant
Typical projects range from standard residential estates to complex multi-storey commercial schemes
Has repeatedly earned industry awards – including multiple TTJ ‘Structural Timber Systems Supplier of the Year’ wins and TRA Roofscape design accolades
Stands out for combining traditional timber strength with modern design innovation and efficient on-site delivery
Culture + Values
55 Years
Experience Delivering Excellence
With over five decades of industry leadership, our expertise is built on delivering exceptional service, innovative solutions, and on-site efficiency.
Mission: "to provide innovative, cost effective timber engineering solutions to enhance the quality, safety and speed of construction"
Commitment to "leading the industry not just in products but in the way we work with customers"
All manufacturing facilities are quality controlled, CE certified, and meet ISO 9001 standards
In-house professional designers collaborate with housebuilders, architects, specifiers, and developers to optimize value
Environment + Sustainability
100% by 2050
Carbon Reduction Target
Commitment to achieving 100% carbon reduction by 2050 across all operations.
2 MW
Solar Capacity
Installed solar PV across 15 branches, with plans to expand to 16, generating significant clean energy.
50%+
Electricity from Solar
Over 50% of electricity needs are now met through solar power installations.
111.5 t
CO₂ Reduction Example
Annual CO₂ reductions achieved at sites like St Ives demonstrate significant environmental impact.
Environmental policy commits to 100% carbon reduction by 2050.
Solar PV installations across 15 branches, soon to expand to 16, totalling over 2 MW capacity.
Solar payback time reduced to approximately 2–3 years due to rising energy prices.
Switched to electric multi-directional forklifts and sideloaders; aiming for a fully electric truck fleet.
Replaced 90% of HGV delivery fleet with Euro 6 compliant vehicles; final upgrades by 2025.
Installed EV charging units at all premises; all company cars are EV or hybrid for the past two years.
Completed full LED lighting upgrades at all premises.