Want to hear how I work? Hit play.Kablio AI applies for you. You just show up to the interviewKablio AI helps you secure roles in construction, clean energy, facilities management, engineering, architecture, sustainability, environment and other physical world sectors.
Get hired, get rewarded!
Land a job through Kablio and earn a 5% salary bonus.
Exclusive benefits
5%Bonus
Fleet Reliability Engineer
Etihad Rail Operating Companies
Etihad Rail Operating Companies manages and operates the UAE’s national railway network.
Abu Dhabi, Abu Dhabi Emirate, United Arab Emirates
Onsite
Company Size
300 Employees
Service Specialisms
Construction services
Project Management
Consulting
Engineering
Design
Technical Services
Turnkey
General Contractor
Sector Specialisms
Industrial
Energy
Infrastructure
Buildings
Residential
Commercial
Water Resources
Heavy Civil
Role
What you would be doing
line management
performance improvement
risk management
data analysis
asset management
quality management
Line management of the Rolling Stock inspectors, providing support and direction as required.
Develop and champion performance improvement initiatives, optimizing maintenance processes and activities and thereby promoting a continuous improvement culture.
Work in close cooperation and consultation with other functions and departments as required.
Ensuring adequate risk management and control measures are in place by the maintenance function.
Management, review and investigation of any non-conformances.
Lead the reliability and performance improvement process, collation and analysis of failure data and all maintenance related statistical data required for RAMS monitoring, handling of key risks and producing performance reports against agreed KPIs as required, for any contracted services review and verify all data and reports as provided by the third party (liaise with contract manager as required)
Lead and carry out technical investigations and compile professional technical reports for all safety and/or mission critical failures.
Produce detailed reports at a frequency and content as and when directed by line manager.
Lead the asset management processes including the support of SAP.
Ensure all fleet maintenance policies, processes and procedures and document control systems are appropriate as per industry best practice or as required under the Entity in Charge of Maintenance (ECM) regulations.
Lead the Quality and Warranty Management processes, supporting other functions such as the procurement department by carrying out technical evaluations and audits of safety critical suppliers or service providers.
What you bring
degree
maintenance
control
rams
analytical
documentation
Good leadership skills
Experience of working in fleet technical department or standards department
Ability to work in a team and on an individual basis
Ability to train technicians and pass on experience and knowledge
Management or supervisory experience
Analytical skills for problem solving
Very good computer skills
Extensive knowledge of engineering change and configuration control processes
Very good planning skills
Ability to analyze, interpret and provide recommendations on engineering issues
Commitment to 'building the National Rail Network consciously' with energy efficiency, sustainability and international standards
Contractor adherence to uniform environmental performance standards
Fencing, animal crossings, noise and visual barriers to protect communities and wildlife, showing responsibility towards environment and neighbours
Environment + Sustainability
-21% CO2 emissions
Annual reduction by rail network
Rail network reduces UAE road transport CO₂ emissions by 21% annually by 2050, equivalent to 8.2 million tonnes of CO₂ per year.
60 M tonnes
Annual cargo target
Targets to transport 60 million tonnes of cargo annually by 2030.
+85% electricity
Solar energy at terminal
Installed solar PV and battery at Ghuweifat terminal supplies up to 85% of its electricity.
≈8.2 M t CO₂/year
Emission reduction impact
Rail network reduces UAE road transport CO₂ emissions by approximately 8.2 million tonnes per year.
Supporting UAE's National Net Zero emissions by 2050 strategy
Rail network projected to reduce UAE road transport CO₂ emissions by 21% annually by 2050 (≈ 8.2 million t CO₂/year) by taking ~300 trucks off the road per train journey
Launched region's first CO₂ Emission Avoidance & Reduction Certificates using EcoTransIT lifecycle Well‑to‑Wheel analysis
Targets to transport 60 million tonnes of cargo annually by 2030
Sustainable Finance Framework aligns future financing with green loans/bonds, includes international green principles, use-of-proceeds criteria, project evaluation, combined with Second-Party Opinion by DNV
Framework supports investment into clean transportation, green buildings, pollution prevention and control
Inclusion & Diversity
No publicly available DEI targets or data on gender balance or diversity outcomes
Hey there! Before you dive into all the good stuff on our site, let’s talk cookies—the digital kind. We use these little helpers to give you the best experience we can, remember your preferences, and even suggest things you might love. But don’t worry, we only use them with your permission and handle them with care.