Responsible for high voltage system integration, operational supervision, and electrical safety rules for high voltage (HV), medium voltage (MV), and low voltage (LV) activities performed on offshore windfarms.
Oversee electrical issues according to regional and local legislation and regulations.
Provide proactive management, efficient coordination, and timely communication between all parties to ensure the process works effectively.
Manage and coordinate HV/MV/LV commissioning activities throughout the project construction stages.
Advise operationally on HV electrical installations to wind turbine generators (WTGs), offshore substations, and both HV submarine and onshore cables.
Oversee all HV/MV/LV electrical operational activities to ensure safety, security, and integrity of the HV network.
Oversee safe commissioning of grid connections, onshore substations, and associated HV/MV/LV plant and equipment.
Implement a permit system for Electrical Safety Rules.
Requirements
hv/lv
scada
sap
275kv cert
5 yrs
protection
Experience with the commissioning, maintenance, and fault-finding of HV/LV systems up to 400kV; end-to-end operations of power plants or offshore windfarms (SCADA); GIS, AIS, or LV switchgears; SAP; and cable systems.
Certification to work on electrical equipment up to 275kV.
Requires up to 30% domestic and foreign travel.
5 years of experience in job offered or as an electrical engineer or similar role.
Knowledge of protection equipment for HV/LV components and safety management for grid connections.
5 years of experience with Orsted’s Electrical Safety Rules and with onshore and offshore substations.
Benefits
Information not given or found
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
Information not given or found
Company
Overview
17 GW Capacity
Renewable Energy Capacity
Operates significant renewable energy capacity across Europe, North America, and Asia-Pacific.
$11B Revenue
Annual Revenue
Achieved over $11 billion in revenue despite operational challenges.
2017 Rebrand
Year of Rebrand
Rebranded to become the world's largest offshore wind farm developer.
35-38 GW Target
Future Capacity Expansion
Aiming to expand renewable capacity to 35-38 GW by 2030.
Shifted from fossil fuels to renewables in its early years.
Builds massive offshore wind projects like Hornsea 1 & 2 and U.S. East Coast farms.
Owns landmark decommissioned assets such as the Esbjerg coal plant.
Partners with turbine makers to innovate using sustainable materials.
Weathers challenges by adapting and maintaining leadership in offshore wind.
Culture + Values
We build a thriving, sustainable world.
We act with integrity and trust.
We take ownership and deliver.
We collaborate and have fun.
Environment + Sustainability
86% reduction
Carbon Emissions Drop
Aimed to achieve an 86% reduction in carbon emissions from 2006 to 2020.
25 GW capacity
Renewable Energy
Owns 25 GW of renewable energy capacity, including offshore wind, onshore wind, and solar.
1.5°C target
Paris Agreement
Became the first energy company in 2020 to set a science-based target aligned with the 1.5°C ambition of the Paris Agreement.
Net zero by 2025
Emissions Target
Aims to achieve net zero emissions by 2025.
The company is the first in the energy sector to set a science-based target aligned with the 1.5°C ambition of the Paris Agreement.
Inclusion & Diversity
50% by 2030
Gender Diversity Target
The company aims to achieve 50% female representation in leadership roles by 2030.
30% in 2020
Female Leadership Achieved
In 2020, the company reached 30% female representation in leadership positions.
Strives for a diverse and inclusive workplace, with a focus on gender balance and diversity of thought.