Identify standard specifications and/or assist in the development of special provisions, special specifications, and general notes governing material and construction requirements for any element of the drainage design.
Identify / document project-specific H&H parameter and criteria considerations utilizing Federal and State regulatory criteria, project criteria, and/or TxDOT procedures and practices.
Finalize hydrologic and hydraulic calculation sheets.
Perform field reconnaissance; collect or review relevant existing stream and watershed data, previous hydrologic studies by others, required hydraulic surveys of existing structures and streams, topographic mapping, and/or past performance of existing facilities at/or adjacent to project location.
Actively participate in implementing improvement initiatives to improve project quality and technical capabilities.
Finalize SW3P,
Perform preliminary hydraulic studies in preparation of environmental documentation for changes in water surface elevation, construction in channels, bridge construction methods that may impact water resources; prepare stormwater pollution prevention plans (SW3P) using project-specific best management practices.
Determine stream flood profiles for existing conditions through hydraulic modeling.
Prepare supporting H&H studies / reports (both for preliminary engineering and final design), including any special documentation for Project crossing FIP designated SFHA.
Use MicroStation, GEOPAK, InRoads and OpenRoads software to develop transportation design projects.
Lead or participate in coordination with Federal Emergency Management Agency (FEMA) as required.
Estimate stream flood profiles under project conditions for multiple design alternatives to determine project impacts; adjust as necessary to mitigate project impacts.
Train members of project design team on various design tasks and tools.
Refine / finalize culvert sizing, invert profile, end treatment and outlet protection,
Establish relationships between flood discharge and Annual Exceedance Probability through hydrologic analysis or by adopting previous hydrologic analyses.
Determine required sizes of drainage structures to meet design criteria.
Prepare pump station details,
Support proposal development, project scoping and client relationship development.
Refine channel design,
Assist in the preparation of cost estimates for drainage structures, and
Lead or participate in coordination with US Coast Guard (USCG) and US Army Corps of Engineers USACE) for projects affecting navigable waterways; ensure proposed design is in compliance with USCG and USACE regulations.
Support Project Manager with adhering to H&H budgets and schedules, client interaction, and implementing QA/QC program.
Prepare final storm drain details including design of appropriately sized inlets at the proper spacing and lateral sizing,
Prepare or lead the development of plan / profile sheets with drainage details.
Perform final hydraulic design for plans, specifications & estimated cost development; including, but not limited to:
Perform bridge scour evaluation and scour countermeasure design,
Requirements
pe texas
6 years
hec-hms
hec-ras
microstation
txdot
TxDOT precertification in applicable design categories a plus.
Experience with HEC-HMS, HEC-RAS, HEC-SSP, USACE PeakFQ, and/or other software that supports TxDOT and/or other agency (city, county, federal) H&H processes and procedures.
Effective communication skills, both oral and written, and able to work well in a team environment.
Licensed Professional Engineer (PE) in the state of Texas.
Minimum 6 years progressively responsible design and/or project management experience with transportation projects.
Preparate / file Conditional Letter of Map Revision (CLOMR)/Letter of Map Revision (LOMR).
Detail oriented and self-starter.
Experience with TxDOT H&H practices & procedures.
Good problem-solving skills.
Capabilities in MicroStation, GEOPAK, InRoads and OpenRoads.
Comprehensive experience with H&H design standards and guidelines (Federal and State).
Minimum 3 years H&H engineering and design.
Benefits
Information not given or found
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
Information not given or found
Company
Overview
Founded with a vision to provide innovative engineering solutions, has grown into a trusted partner in numerous industries.
Over the years, has expanded its expertise, delivering high-quality services in areas such as energy, water resources, transportation, and infrastructure.
Approach to every project blends technical expertise with practical solutions, ensuring timely, cost-effective, and sustainable results.
With a strong track record in both public and private sectors, has handled projects ranging from large-scale infrastructure developments to specialized environmental services.
Portfolio spans critical infrastructure projects, energy systems, water management, and transport networks, among other diverse industries.
Commitment to excellence has led to involvement in projects that shape communities, enhance industry standards, and contribute to economic growth.
Culture + Values
Environment + Sustainability
$3M Revenue
Renewable Energy Assignments
The company secured $3 million in assignments focusing on renewable energy solutions, including solar, electric vehicle infrastructure, and energy storage within 90 days of acquiring SEI in 2022.
2030 Target
Net-Zero Commitment
The company has set a net-zero (carbon neutrality) target to be achieved by the year 2030.
Completed inaugural double materiality assessment in June 2024 identifying 13 key sustainability areas
Environmental sciences team conducts natural resource inventories, wetland delineations, habitat assessments for threatened/endangered species
Sustainable Buildings service spans ASHRAE levels 1-3 energy audits, energy simulation, benchmarking, carbon-footprint analysis, and incentives maximization
Energy Star partner offering green-building strategies (LEED, NGBS, ENERGY STAR, Zero Energy Ready, Enterprise Green Communities)
Acquired FCS Group (July 2024) to expand utility services and sustainability consulting
Acquired SEI (2022) and booked $3 M in renewable-energy (solar, EV, storage) assignments within 90 days
Inclusion & Diversity
Committed to building a representative workforce focused on social and environmental initiatives
Strategic focus areas: innovation via inclusive culture; recruitment of diverse talent; affinity‑group engagement; strategic DEI partnerships
Hiring, retention and advancement of women and underrepresented populations