Manage the design of integrated platforms that connect existing legacy systems with new cloud-native or SaaS solutions.
Define how digital platforms, tools, and integrations will work together (e.g., mobile apps, cloud-based services, analytics, IT/OT, customer portals).
Participate in reviews, pilots, and MVP delivery to validate assumptions.
Translate business objectives into technical roadmaps and digital service designs.
Ensure all solutions comply with data governance, cyber security, and ISO 19650 / ISO 27001 standards.
Continuously scan for emerging technologies (e.g., AI, digital twins, automation) that can improve RSE’s digital capabilities.
Produce and maintain architectural documentation (e.g., solution diagrams, interface specs, data flow models) to guide development and delivery.
Manage the design and development of end-to-end digital solutions that align with the engineering, operations, and BIM delivery and Digital Transformation strategies.
Requirements
degree
azure
solutions architect
stakeholder
bim
digital solutions
Degree, HND or HNC in Architecture, Engineering, Digital Construction, or related technical discipline would be advantageous.
Strong knowledge of cloud platforms (Azure preferred), APIs, systems integration, and data architecture.
Full UK Driving Licence
Proven experience in a solutions architecture role within digital transformation, engineering, infrastructure, or water/utilities sector.
Excellent stakeholder management, technical documentation, and communication skills.
Familiarity with BMS, BIM, ERP, IT/OT systems, CRM, and asset management platforms.
Experience in developing digital solutions to support business change.
Benefits
Discounted National Gym Membership
Company Pension Scheme
Holiday Allowance of 31 days per year, rising to 33 days per year after 2 years’ service
Access to our network of health professionals including mental health champions and Occupational Health Nurse.
Industry-leading salary based on your experience
Cycle to Work
Holiday Buy / Sell Scheme
Employee Discount Platform
EV/Hybrid Car Lease Scheme
Private Healthcare (Personal)
A flexible career development path, with no restrictions on where your career can go
The company was established in 1982, marking the beginning of its journey as a water purification contractor.
Four decades
Experience
Over 40 years, the company has evolved into a full-service innovator and leader in water treatment solutions.
It evolved into a full‑service innovator, designing, fabricating and commissioning modular water treatment plants across the UK.
Its financial growth is anchored in delivering award‑winning, cost‑efficient engineered plants, often via offsite assembly and pre‑commissioning.
Typical projects range from ceramic membrane filtration to bespoke ultrafiltration and ion‑exchange systems for water and wastewater.
RSE’s Innovations Hub adapts breakthrough tech—like MABR, nature‑based and zero‑chemical systems—from renewables and other sectors.
It stands out with transportable, 3D‑BIM‑designed plants assembled in clean‑factory settings, minimizing onsite disruption.
Facilities span from Inverness to London, enabling rapid deployment of modular solutions for varied urban and rural clients.
Culture + Values
“Commitment to operational Zero Harm and placing safety first in every situation.”
“Technical excellence through ongoing investment in emerging technologies and sharing expertise.”
“Customer success via transparency, ongoing communication and partnering from first meeting to project completion.”
“Nurturing personal growth by encouraging clear expectations, training plans and career development support.”
“Honesty and integrity in all relationships, led by example through ethical and open communication.”
Environment + Sustainability
14% Electricity
Renewable Energy Usage
A significant portion of electricity consumption is powered by solar energy installations.
300kW Solar
Renewable Installations
Over 300 kilowatts of solar panels have been installed as part of sustainability initiatives.
10% Reduction
Emissions Performance
Achieved a 10% reduction in operational carbon emissions per £M revenue in the latest fiscal year.
25% Carbon
Construction Efficiency
Modular off-site construction reduces carbon emissions by up to 25%, also cutting site traffic by 95%.
Operational Net Zero (Scope 1+2) by 2030; full Net Zero (Scope 1, 2 & 3 including embodied supply chain carbon) by 2035.
Introduction of HVO fuel across sites, plus EV charge‑points and low‑carbon commuting schemes.
Support for verified offset projects (Verra, Gold Standard, UN CER) via Carbon Neutral Britain including kelp restoration, mangrove blue carbon and Costa Rica reforestation.
Innovations include first ceramic‑membrane water plant in Scotland; products designed to help clients meet Net Zero targets.
Inclusion & Diversity
Graduate and Apprenticeship programmes to develop early‑career talent.
Employee health & wellbeing mission: erasing stigma around mental health; official supporter of Lighthouse Construction Charity.