Implement Company design procedures with the relevant stakeholders, ensure there is a full understanding of the scope documents, and the system design is fully compliant with relevant standards and regulations.
To represent the Company consistently and positively to customers in line with the Customer Care Requirements.
To ensure all documentation is accurately completed, stored, and provided to appropriate personnel when required.
To always maintain effective communication with both internal and external customers.
Manage the post order design process from sales handover to completion, ensuring all documentation/drawings/calculations are produced/recorded and reported in line with company standards.
Requirements
in-house training
computer systems
customer communication
accurate information
internal customers
external customers
To become fully competent, through in-house training, in the use of the Company’s computer systems to meet customer requirements and communicate accurate and valid information when conversing with both internal and external customers.
Benefits
Information not given or found
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
Information not given or found
Company
Overview
~£125m
Annual Sales
Achieved annual sales of £125 million in 2021, marking significant growth and success.
900 Years
Historic Site
Upgraded life-safety systems at the historic Palace of Westminster, a site over 900 years old.
Founded in 1968 in Nelson, Lancashire, the company evolved from a regional installer into a UK‑wide systems integrator.
Over seven decades it delivered iconic safety solutions to venues like the Olympic Stadium, Palace of Westminster and Manchester Airport.
Building on its UK success, it exports to over 70 countries across six continents and has its own R&D and manufacturing centre.
As of 2021 it achieved ~£125 million in annual sales and was acquired by Bosch Building Technologies to accelerate European growth.
Its project scope ranges from commercial and transport hubs to stadia, government sites and data centres, offering turnkey services.
Expertise spans fire detection, voice evacuation, public address, emergency lighting, CCTV, access control and network solutions.
In a high‑profile move, Protec upgraded life‑safety systems at the 900‑year‑old Palace of Westminster and supported state events.
Culture + Values
Everyone Goes Home, No One Gets Hurt
We Combine Individual Strengths To Develop Exceptional Results
For All. Always.
Action That Inspires Trust and Confidence.
It's NOT The Job You DO. It's HOW You Do The Job.
Consistently Delivering On Our Commitment To Excellent Customer Service.
Great Acts Are Made Up Of Small Deeds.
Environment + Sustainability
6,300 tonnes
Plastic Waste Recycled
The company recycled 6,300 tonnes of plastic waste, significantly reducing environmental impact.
22,000 tonnes
GHG Emissions Diverted
Prevented 22,000 tonnes of greenhouse gas emissions, equivalent to the absorption of 1,102,500 trees.
Half Embodied Carbon
Reduced Carbon Footprint
ProSignRE signage has half the embodied carbon of standard materials, promoting sustainability.
Top 35% Globally
EcoVadis Bronze Certification
Achieved EcoVadis Bronze certification, ranking in the top 35% of companies globally.
Certified carbon neutral status in 2021 via verified carbon offsetting, with plan to achieve Carbon Zero
Operate a Carbon Reduction Plan across all activities under ISO14001-accredited Integrated Management System
Procure materials from ethical, sustainable sources; devices designed for long lifecycle and 100% end-of-life recycling
Closed‑Loop remanufacturing: state‑of‑the‑art plant recycles used protection into new ProplexRE sheets and signage
ProSignRE signage made from 100% waste plastic, fully recyclable