Provide technical support to engineers and designers using SP3D, addressing queries and resolving issues promptly.
Participate in project kickoff meetings to understand requirements and scope of SP3D usage in projects.
Act as the primary point of contact for SP3D software vendors, managing updates, support services, and license renewals.
Prepare and maintain comprehensive documentation for system configurations, processes, and user instructions.
Implement and monitor quality control measures to ensure compliance with company standards and project specifications.
Conduct regular audits of the SP3D environment to identify areas for improvement and implement corrective actions.
Develop and maintain user documentation, including guides, process flows, and FAQs.
Oversee database management, including data setup, maintenance, and performance tuning.
Document issues and resolutions to build a knowledge base for future reference.
Work closely with engineering teams to understand project requirements and tailor SP3D configurations accordingly.
Monitor system performance, troubleshoot issues, and implement solutions to maintain system integrity.
Identify opportunities for process improvements and efficiencies within the SP3D environment.
Ensure the integrity and security of project data within the SP3D environment, including backup and recovery procedures.
Stay current with industry trends in 3D design technology and recommend innovations to enhance functionality.
Install, configure, and upgrade SP3D applications and related tools on servers and user workstations.
Conduct training sessions and workshops for new users on SP3D functionalities and best practices.
Stay updated on new features and enhancements in SP3D and evaluate their applicability to Tecnimont’s operations.
Manage and maintain the SmartPlant 3D (SP3D) software environment, ensuring optimal performance and availability.
Assist in the development of design standards and templates to streamline workflows and enhance productivity.
Collaborate with project managers to align SP3D resources and support project timelines and deliverables.
Requirements
Benefits
Information not given or found
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
Information not given or found
Company
Overview
Founded 1957
Year Established
The company was established in 1957.
With decades of experience, the company specializes in executing complex projects in the energy and industrial sectors.
Tecnimont's portfolio spans across refining, petrochemical, chemical, and energy transition projects.
The company has a track record of delivering large-scale, cutting-edge solutions in energy infrastructure, including power plants and industrial plants.
Tecnimont has been instrumental in shaping the future of the energy sector with a focus on sustainability and efficiency.
Notable projects include the construction of world-class refineries, petrochemical plants, and energy facilities across the globe.
Tecnimont embraces innovation, leveraging advanced technology and engineering excellence to deliver high-quality solutions.
Culture + Values
People
Technology
Complexity
Respect
Multiculturalism
Shared values
Competence, entrepreneurship and adaptiveness
Environment + Sustainability
20% CO₂ reduction
Emissions Reduction Target
Achieve a 20% reduction in CO₂ emissions (Scope 1 and Scope 2) by 2023 compared to a 2018 baseline.
35% CO₂ reduction
Emissions Reduction Target
Achieve a 35% reduction in CO₂ emissions (Scope 1 and Scope 2) by 2025 compared to a 2018 baseline.
Carbon neutrality by 2030
Emissions Goal
Aim to achieve carbon neutrality for Scope 1 and Scope 2 emissions by 2030, with an extended target to include Scope 3 emissions before 2050.
100% sustainable suppliers
Supplier Selection
Ensure 100% of new suppliers are selected based on sustainability criteria.
Scope 1 HQ emissions dropped from 814 t CO₂ eq. (2018) to 327 t CO₂ eq. (2020); similar drops in Scope 2 and Scope 3 reported.
Recycling rate increased from 110.5 t (2018) to 159.6 t (2020)
Energy intensity at HQ reduced from 11048 kJ/ man‑hours (2018) to 6785 kJ/ man‑hours (2020); on-site from 23849 to 14203