Traffic Engineer

Company logo
Arcadis
Global design, engineering and consultancy firm delivering intelligence‑driven sustainable solutions for natural & built assets.
Manage and optimize adaptive traffic signals (ITACA) across Mumbai ATC project.
24 days ago ago
Intermediate (4-7 years)
Full Time
Mumbai Metropolitan Region
Office Full-Time
Company Size
36,000 Employees
Service Specialisms
Consulting
Engineering
Architecture
Project Management
Design
Technical Services
Construction Services
Urban Planning
Sector Specialisms
Infrastructure
Water
Environment
Buildings
Transport
Utilities
Role
What you would be doing
fault analysis
system performance
synchronization review
offset configuration
detector review
plan library
  • Identification of issues in any particular junction (either manual handling or parking etc.
  • Synchronisation review – The review of synchronization (flow v/s cycle) of each sub area shall be taken based on historical data. Before review, junction plan & offset of all the junctions corresponding to that sub area shall be verified physically on site.
  • Optimisation of standalone tables
  • Issues of maintenance of the system – The monthly review shall be taken with maintenance agency in presence of BMC Engineer.
  • System Performance Review -- For all ATC signal junction
  • Operational Review- For all ATC signal junction
  • Fault analysis – Area wise fault analysis (Island City, Western Suburb, Eastern Suburb) for all junctions shall be done on the basis of daily generated faults in FMS system & manually.
  • Detector performance review – The performance review of Vehicle Detection camera shall be done on the basis of daily generated faults in FMS system.
  • Configure Optimized offsets (In consultation with Client Engineer, Traffic Police & O&M Site Team)
  • Identification of issues in any particular junction (either manual handling or parking or phasing and timing, etc.)
  • Configure &/or modify ITACA systems components subarea/count site/link/ junction/ route
  • Configure/Edit Green wave if required (In consultation with Traffic Police)
  • Sub area setup review -The review on sub area set up shall be verified physically on site.
  • Update and improve Plan Library including data from site and Adaptive operation of system
  • System availability review – The review of Server, MTNL & Power Supply down time shall be done.
  • Review of response time of the Maintenance Contractors
What you bring
itaca
traffic rules
link calibration
system performance
scheduler
corridor review
  • First 15 days of quarter - Review of corridor Before calibration
  • Configure Expert Traffic Rules Editor as per requirement
  • Last 15 days of quarter - Review of corridor after calibration
  • 2 months Link calibration
  • System Performance of ITACA
  • Optimisation of standalone tables – The junction parameters shall be physically verified at site location and same shall be conformed in ITACA system as mentioned below:
  • Scheduler of the System shall be verified.
Benefits
  • Maximum Queue
  • Journey Time
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
Information not given or found
Company
Overview
1888
Year Founded
The company was established in the Netherlands with a focus on reclaiming wetlands.
30+ Countries
Global Presence
Operates in over 30 countries worldwide, showcasing its extensive international reach.
€5B
2023 Revenue
Achieved €5 billion in gross revenues, reflecting strong financial performance and strategic growth.
  • Evolved into a global design, engineering and consultancy powerhouse.
  • Excels in major infrastructure, water management, urban building, transport and industrial manufacturing projects worldwide.
  • Recent standout assignments include flood defences in New York, the Sydney Metro, and sustainable legacy planning for the Paris Olympics.
  • Structured around core business areas—Places, Mobility, Resilience and Intelligence—backed by digital centres of excellence.
  • Notable for blending data-driven tools with traditional consulting to optimise asset lifecycles and smart infrastructure.
Culture + Values
  • People First
  • Collaboration
  • Client Success
  • Integrity
  • Sustainability
Environment + Sustainability
Net-Zero by 2035
GHG Emissions Target
Commitment to achieving net-zero across the entire value chain.
70% Reduction
GHG Emissions Target
Aiming for a 70% reduction in absolute scope 1 and market-based scope 2 GHG emissions by 2026, measured from a 2019 baseline.
58% GHG Reduction
Emissions Progress
Achieved a 58% reduction in scope 1 and 2 GHG emissions by end-2023 compared to 2019 levels.
100% Renewable Energy
Energy Consumption
Purchases renewable electricity certificates to cover all office and work-from-home energy use.
  • Transition of company fleet to EVs by 2030 (currently 26–35% by late 2024)
  • 50% reduction in air travel emissions by 2025 (currently ~29%)
  • 35% reduction in business travel emissions by 2025 (already at ~37%)
  • Joined supply-chain emissions platform in 2023 to capture supplier scope 3 data
Inclusion & Diversity
>40% Female Workforce
Gender Diversity Goal
Targets over 40% of workforce to be female by the end of 2026, reflecting a strong commitment to gender balance.
Top 25% eNPS
Employee Satisfaction Ranking
Aims to remain in the top 25% of the professional services sector for employee satisfaction, as measured by eNPS scores.
  • Continues to develop people through Skills Powered Organisation and Energy Transition Academy
  • GEC recruitment drive and increased focus on global roles to support diverse career paths
Big Kablio Logo
Kablio AIIf you're someone who helps build and power the world (or dreams to), Kablio AI is your pocket-sized recruiter that gets you hired.
Copyright © 2025 Kablio