Designs and manufactures underground and aerial cable systems, insulators, and accessories for utility transmission and distribution.
Support plant safety, drive process improvements, and assist engineering projects.
3 days ago ago
Entry-level
Internship
Milford, NH
Onsite
Company Size
201 Employees
Service Specialisms
Design
Engineering
Installation
Manufacturing
Turnkey engineering and installation
On‑site installation assistance
Training
Inspection services
Sector Specialisms
Electric Power Infrastructure
Distribution Circuits
Transmission Circuits
Medium Voltage Power Cable
Underground Cable Systems
Overhead Cable Systems
Substations
Subsea Cable Systems
Role
Description
troubleshooting
waste elimination
cmms implementation
process improvement
lean kaizen
documentation
Troubleshooting of day to day processes when an issue arises, with working towards a root cause and elimination.
Ownership of waste elimination projects.
Support plant safety objectives together with safety improvements.
Process support for capital projects, implementation of new CMMS and Live monitoring software.
Drive process improvements with support from Operations and Engineering where needed.
Support day to day operations with assigned problem solving and improvements.
Participation in LEAN Kaizen events for Continuous Improvement efforts.
Documenting process via Marmon Utility’s standard process sheet.
Requirements
bachelors
engineering
data
proactive
four semesters
us eligible
The internship will run for 12 weeks from May to August
Bachelor's Degree in progress within the field of Plastics, Chemical, Electrical or Mechanical Engineering or equivalent science/math-based degree.
The use of data and statistics to make decisions.
Excellent work ethic with ability to work independently and be proactive.
Previous work experience, open to previous non-engineering backgrounds.
Completed at least four semesters towards degree.
Able to work in the US indefinitely and without restrictions.
Benefits
Exact start and end dates are flexible based on school schedules and the needs of the business.
Full Time, 40 hours per week.
This is a paid internship.
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
candidates must complete additional job-related screening processes after a conditional offer.
Company
Overview
2010
Year of Merger
The company was formed through the merger of Hendrix Wire & Cable and Kerite in 2010.
115 kV
Maximum Voltage Capacity
The company provides aerial spacer solutions capable of handling voltages up to 115 kV.
2019
First Tier-1 Offshore Wind Manufacturer
Their Kerite facility became America's first Tier-1 offshore wind cable manufacturer in 2019.
Woven decades-old expertise into a unified cable powerhouse.
Headquartered in New Hampshire and Connecticut, operates U.S. factories crafting US-made aerial spacer systems, underground cables, and polymer insulators.
Backed by Marmon/Berkshire Hathaway, leverages deep financial stability to fund leading-edge cable innovation and steady expansion.
Typical projects include medium- and high-voltage underground distribution and offshore wind inter-array cables.
Notable work includes supplying Kerite cables for the Park City Wind project and delivering Hendrix spacer systems for solar ranches across multiple states.
Distinctive aerial spacer design pioneered over 50 years ago mitigates outages, wildfire risk, and voltage drop across rugged terrain.
Culture + Values
Vision: Become the preferred supplier to service customers’ critical loads…known in the industry for providing innovative products and services with the highest reliability, quickest delivery and greatest ROI.
Mission: Connect and energize employees and suppliers to build and deliver new capabilities, expanding our ability to anticipate and meet customer needs while exploring new markets.
Accuracy
Quality
Long-term ROI
Lower total cost of ownership
Shortest industry lead time
Consistent, dependable delivery
Made in the US
Quick response
Commitment to continuous education, additional training, mapping ideal career goal progression and recognition
Environment + Sustainability
600+
Residents using renewables
Delivered a complete renewable-energy island grid system for residents to operate fully on renewables.
Built and shipped from US facilities to ensure supply‑chain dependability and reduce overseas logistics emissions
Hendrix aerial covered cable systems reduce environmental impact via storm‑hardening and outage prevention
Use of HDPE (high‑density polyethylene) insulators—lighter, impact‑resistant, chip/crack‑resistant and more durable