Review and develop schedules for the construction of highways, bridges, and railways
Train other scheduling personnel in CPM and scheduling practices
Scope control and change management and incorporate directed changes into schedule baseline
Analyze, report on, recommend mitigation options and recommend responsibility for construction project delays
Update and produce scheduling management reports
Identify and assist in analysis of project schedule variances. Identifies and analyzes schedule variances and recommends associated corrective action
Provide expert review and analysis of construction schedule critical path and logic changes and milestone status
Assist in leading junior staff through assignment tasks
Develop and/or review Suggested Preliminary Construction Schedules during the final design stage based on the available plans, specifications and estimate provided by the project designer
Measure progress and reviews invoices of contractors
Responsible for construction contracting and the scheduling implications of contract terms
Support the development of plans and schedules for proposals
Provide expert review and analysis of Contractor Critical Path Method (CPM) Progress Schedules
Responsible for assembling data for schedule updating
Lead Scheduler on major construction projects
Develop CPM schedule logic for engineering, procurement and construction as well as command of cornerstone scheduling system
Supports various levels of project reporting
Resource load schedule and perform remedial schedule risk analysis
Responsible for some elements of baseline schedule and associated maintenance
Update policies, procedures, specifications of guidance related to construction scheduling and construction project management
Assists in procedure development and implementation
Analyze and prepare schedule fragnets and delay event timelines for construction project delays
Use drawings and specifications for schedule development
Participates in and at times leads project planning and scheduling review meetings
Assist in tracking corrective actions
Analyze schedule data to identify key project issues
Assist in the development and maintenance of WBS and helps insure that project coding is effectively used for all cornerstone applications
Assists in performance measurement and associated schedule trends
Assist in the coordination of schedule input from all parts of the organization
Requirements
primavera p6
civil engineering
construction management
scheduling
cost analysis
communication
Experience with construction methods for highways, bridges, and rails
Excellent communication and writing skills
Experience in creating schedules to determine contract time
BA/BS in Civil Engineering, Construction Management + 8 years of related experience or demonstrated equivalency of experience and/or education
Basic cost analysis and forecasting as it relates to planning and scheduling
Will use Oracle Primavera P6
Master's in Civil Engineering, Construction Management or similar
Competency in reviewing construction schedules
Capability to read and interpret plans relating to highway, bridge, and rail construction
Experience in Oracle Primavera P6 software
Benefits
Relocation is not available for this position
Sponsorship is available for this position
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
sponsorship is available for this position
Security clearance
Information not given or found
Company
Overview
Born 1990
Year of Formation
The company was formed in 1990 through the merger of five legacy firms.
$16B annual revenue
Annual Revenue
The company generates over $16 billion in revenue annually and ranks highly in ENR's global design firm lists.
150+ countries
Global Presence
The company operates in over 150 countries worldwide.
Megaprojects delivery
Project Scope
The company is known for delivering megaprojects such as cable-stayed bridges, Olympic venues, ports, transit hubs, and disaster recovery works.
Launched as a bold independent infrastructure consultancy from a merger of five legacy firms dating back over a century.
Handles everything from geotech to electro-mechanical systems, as seen in the award-winning Romaine Hydroelectric Complex in Canada.
Guides projects through every lifecycle stage in transportation, buildings, water systems, energy, and environmental sectors.
Culture + Values
Safety first - We put safety at the core of everything we do.
Integrity - We act with the highest ethical standards.
Collaboration - We believe in the power of teamwork.
Innovation - We embrace creativity and foster new ideas.
Sustainability - We are committed to creating a sustainable future.
Environment + Sustainability
2040
Net Zero Carbon Target
Committed to achieving net zero carbon emissions by 2040.
50%
Emission Reduction Target
Committed to reducing operational carbon emissions by 50% by 2030.
Focus on decarbonization across client projects and operations.
Developed strategies for climate resilience and adaptation.
Initiated projects that contribute to sustainable infrastructure and urban planning.
Inclusion & Diversity
50% gender parity
Gender Parity Target
Aim to achieve gender balance in leadership positions by 2030.
35% increase
Women Leadership Growth
Achieved significant growth in women representation in leadership roles in 2022.
Committed to increasing racial and ethnic diversity across the company.
Implemented programs to foster a diverse and inclusive workplace culture.