Operates and upgrades Australia’s high-voltage electricity transmission network, linking generators, distributors & major users.
Design high‑voltage transmission systems, lead calculations, and coordinate teams.
7 days ago ago
Experienced (8-12 years)
Full Time
Sydney, New South Wales, Australia
Office Full-Time
Company Size
1,147 Employees
Service Specialisms
Systems Protection
Power System Analysis
Telecommunications
Electric power transmission
Renewable generation connections
Network connections
High‑voltage transmission lines
Sector Specialisms
Energy
Infrastructure
Renewable Energy
Electricity Transmission
Grid Technology
Smart Grid
Wind
Solar
Role
Description
hv design
feasibility study
design calculations
specialist studies
Perform and review and approve high voltage designs in accordance with Australian and IEC standards, as well as Transgrid technical requirements.
Prepare and review or manage feasibility studies to determine HV design requirements for proposed projects.
Complete detailed design calculations including short circuit forces, conductor sizing, lighting and lightning protection studies.
Manage or complete studies in specialist areas such as earthing, noise, electric and magnetic fields, corona performance, insultation coordination or power coordination.
Requirements
high voltage
projectwise
microstation
design approval
project management
electrical engineering
Extensive experience in high voltage design across all functional areas of transmission network substations.
Proficiency with engineering business systems and design software, preferably Bentley ProjectWise and MicroStation.
Ability to complete, review and approve project designs with both internal teams and external consultants and contractors.
Experience overseeing the completion of designs to meet project requirements and timeframes.
Degree qualification in Electrical Engineering or a related discipline.
Benefits
Information not given or found
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
Information not given or found
Company
Overview
4,000 km Fibre
Optical Fibre Network
Operates one of Australia’s largest optical-fibre networks alongside power lines for telecom and system resilience.
900 km Link
EnergyConnect Project
Developing the 900 km, 800 MW EnergyConnect link to enhance renewable energy distribution and grid security.
12 GW Clean
Clean Energy Capacity
Added 12 GW of clean energy connections through its commercial arm Lumea, powering around 4 million homes.
A$16.5B Investment
Future Grid Modernisation
Plans to invest A$16.5 billion over the next decade to support 100% instantaneous renewables and modernise grid security tools.
Born in 1995 from the split of NSW’s Electricity Commission, it evolved into Australia’s largest high-voltage grid operator.
Manages over 13,000 km of transmission lines and 104 substations across NSW and the ACT, linking into the National Electricity Market.
Over a decade, rolled out a A$16.5 billion upgrade program, including mega-projects like EnergyConnect and HumeLink to reinforce energy superhighways.
Commercial arm Lumea has added 55+ renewable generators, contributing to the clean energy transition.
Backed by a major consortium including Spark, Utilities Trust of Australia, CDPQ, ADIA, and OMERS following a A$10.3 billion lease deal in 2015.
Key projects include the multi-state HumeLink (underway) and VNI West interconnector, despite community pushback.
Despite challenges, remains pivotal to Australia’s clean-energy transition.
Culture + Values
Safety
Integrity
Collaboration
Reliability
Innovation
Progress
People, Power and Possibilities
Environment + Sustainability
60% reduction
Scope 1 & 2 Emissions
Achieve a 60% reduction in Scope 1 & 2 emissions by 2030, with net-zero by 2040.
48% reduction
Scope 3 Emissions
Reduce Scope 3 emissions per $M spend by 48% by 2030, aiming for net-zero by 2050.
100% renewable
Electricity in Offices
Transition to 100% renewable electricity in offices and depots by 2025.
$1.8b
EnergyConnect Project
EnergyConnect project secures International Sustainability Council agreement with comprehensive targets.
Reducing Scope 3 emissions in Purchased & Capital Goods by 48% per $M spend by 2030.
Eliminating SF₆ emissions through alternative development.
Transitioning fleet of passenger & commercial vehicles to fully electric/hybrid by 2030.
Largest wind farm in NSW (Rye Park) connected, powering ~215,000 homes annually.
Investing $14b in transmission lines, $2.2b in system-strength technology, and $300m in operations/tools to support 100% instantaneous renewables.
Inclusion & Diversity
40% Women
Target Workforce Ratio
Company aims for a workforce composition of 40% women, 40% men, and 20% any gender.
65% Men
Primary-Carer Parental Leave
65% of primary-carer parental leave was taken by men in FY24, reflecting inclusive parental leave policies.
50% Female
Executive Leadership Team
The Executive Leadership Team achieved gender parity, with 50% female representation in FY24.
50% Award
Clean Energy Council Award
Recognized with the 2024 Clean Energy Council Equity, Inclusion & Diversity Award for leadership in the industry.