Manage a significant amount of work as a project manager and be responsible for several projects
Build relationships with the design team and/or clients
Mentor 1-2 developing engineers
Become responsible for managing projects through all phases of development
Receive technical guidance on unusual or complex projects
Learn and understand contract terms and the scope of service
Advance the design of the project with those you supervise
Responsible for all facets of product delivery to assigned clients and shares accountability for satisfaction
Coordinate and lead daily team activities with inside and outside design team members
Work with the Group Leader to inform, manage, and meet project schedules
Respond to requests from clients and communicate information on time to strengthen trust in your advisor
Requirements
autocad
revit
bachelor's
pe
7 years
management
Expert knowledge of building codes and standards, engineering drafting standards, mechanical engineering standards, and other trades
Expert understanding of the construction process and interpretation of construction drawings
Expert knowledge of AutoCAD and Revit
Bachelor’s degree in engineering required; PE highly preferred
Minimum 7 years of experience in mechanical engineering; field experience required; people management experience highly preferred
Experiencing managing and assisting in managing project teams
Benefits
Information not given or found
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
Information not given or found
Company
Overview
1968 Founded
Year Established
The company was originally founded in 1968.
August 2024
Acquisition Date
Acquired the NYC-based AMA Group to expand its expertise.
10M sq ft
Zero-Energy Space
Has designed over 10 million square feet of zero-energy space.
175 MW Renewables
Renewable Capacity
Developed 175 megawatts of renewable energy systems.
Integrates building science and data-driven analytics to design zero-energy and zero-carbon facilities across varied markets.
Works across education, healthcare, commercial, federal, and local government sectors, often delivering geothermal and renewable energy systems.
Has designed over 130 million sq ft of decarbonized buildings.
Notable for the first WELL Gold certified zero-energy corporate headquarters in the U.S., showcasing its commitment to occupant health and resiliency.
Culture + Values
Work makes a meaningful impact in communities and on the environment.
Teams enhance the performance and sustainability of the built environment, promoting healthier spaces.
Employees are recognized for their contributions and the company’s achievements, fostering a culture of appreciation.
Growth opportunities are available for both young engineers and experienced professionals.
A culture of excellence exists where people and leaders encourage continuous professional improvement.
Strong personal relationships are built with coworkers, leaders, and clients.
Flexible work schedules, cross-office collaboration, and opportunities to contribute to environmental sustainability are provided.
Environment + Sustainability
10.65M sq ft
Operational Zero Energy Facilities
Engineered over 10.65 million square feet of operational Zero Energy facilities, showcasing commitment to energy efficiency and renewable integration.
7M sq ft
Operational Zero Carbon Facilities
Delivered 7 million square feet of operational Zero Carbon facilities, demonstrating leadership in carbon neutrality.
50M sq ft
Zero Energy Ready Facilities
Delivered 50 million square feet of Zero Energy Ready facilities designed to meet energy efficiency standards (<35 EUI).
1,050 metric tons
CO₂ Reduction Annually
Catawba College's solar panels reduce 1,050 metric tons of CO₂ annually, equivalent to removing 193 vehicles from the road.
Pioneered the first Zero Energy school in the U.S. (Richardsville Elementary, 2010), first WELL-certified & Zero Carbon school (John Lewis Elementary BCPS, 2021), first Zero Carbon Behavioral Health Hospital (Brockton BHC, 2022), and first Carbon-Positive hotel design (Populus Hotel).
Zero Energy design philosophy: achieve drastic energy reduction first, then add renewables to minimize system size and optimize investment.
Led multiple net-zero school projects in VA and DC, achieving EUIs under 20 via solar arrays, geothermal HVAC, all-electric systems, and real-time energy dashboards.
Supported Catawba College in achieving carbon neutrality in April 2023—seven years ahead of its 2030 target—through on-site renewable energy, efficiency upgrades, geothermal systems, electrification, and offsets.
Catawba’s solar panels generate ~7 million kWh annually, saving ~$5 million over 20 years.
Catawba geothermal heat pumps eliminate ~265 MMBtu natural gas and ~145,724 kWh electricity (~51 metric tons CO₂/year).
Net-zero (zero energy) target already achieved in numerous projects; corporate net-zero goal implied via built portfolio.
Inclusion & Diversity
The best outcomes are from a diverse group of voices. We believe diversity, equity, and inclusion are essential to being a national leader and creating the best products, services, and experiences for our employees and clients.
Highlighted internal leaders in diversity roles include Terri Laurence, Carrie Kelty, Roger Maybrier, Steve Torre, Liz Alford, Cole Parkinson, Tracy Steward, and Johnathan Stewart.