Login
Sign up
Assembler I (5:00am to 1:30pm) Viper Internal
G&W Electric Co.
Assemble components and sub‑assemblies following instructions in a manufacturing setting.
7 days ago ago
$20 - $24
Entry-level
Internship
Bolingbrook, IL
Onsite
Company Size
1,000 Employees
Service Specialisms
Engineering
Design
Technical Services
Consulting
Turnkey
Sector Specialisms
Industrial
Commercial
Higher Education
Military
Government
Power Grid Automation
Critical Power
DERs (Distributed Energy Resources)
+2 more
Role
Description
prototype build
component assembly
quality inspection
blueprint review
assistive lifting
documentation
Requirements
high school
computer skills
drawings
power tools
manufacturing
heavy lifting
Benefits
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
People also searched
Operations Technician Jobs in Naperville United States
Quality Assurance Jobs in Naperville United States
Production Engineer Jobs in Naperville United States
Industrial Engineer Jobs in Naperville United States
Maintenance Technician Jobs in Naperville United States
Mechanical Technician Jobs in Naperville United States
Quality Inspector Jobs in Naperville United States
Materials Technician Jobs in Naperville United States
Share this job
Company
Overview
1905 Founded
Company Origin
The company was established in a small Chicago machine shop, marking the beginning of its innovative journey.
1920s Innovation
Manual Oil Switches
The company pioneered manual oil switches during the 1920s, a significant advancement in electrical equipment.
371,000 Sq Ft
Manufacturing Facility
The company operates a large, state-of-the-art facility dedicated to R&D and manufacturing.
Culture + Values
Environment + Sustainability
~6,000 solar panels
Rooftop Solar Installation
Installed on the Bolingbrook headquarters rooftop, covering an area equivalent to 7.7 football fields.
1,500+ tons CO₂
Emission Reduction
Reduction in carbon dioxide emissions achieved through the solar installation.
$1.8 M saved
Production Cost Avoidance
Microgrid maintained power through 13 outages since activation in 2023, preventing significant production losses.
$2.6 M received
Energy Rebates
Total rebate from ComEd, including $600k for solar and $2.0 M for battery storage.
Inclusion & Diversity
Articles
Careers at G&W Electric Co.
G&W Electric Co. Products
G&W Electric Co. Newsroom