Founded in 2019 by a trio of entrepreneurs with a mission to consolidate boutique family-owned service brands.
Partnerships include Jackson Mechanical and specialized platforms in chiller, refrigeration, controls, and heavy mechanical.
Typical projects include multi-site retail HVAC roll-outs, preventive maintenance contracts, and large-scale landscape and snow-management programs.
Commercial landscaping services under its SunWorks banner manage grounds for corporate campuses and distribution hubs nationwide.
Its facilities maintenance network offers interior handyman, roofing, fencing, plumbing, locksmith, and exterior lot care with tech-driven coordination.
About the client
About the client
Information not given or found
Role
Description
planning database
schedule integration
integrated scheduling
reporting
progress monitoring
risk assessment
Maintain the planning database and scheduling tools to ensure they remain accurate, current, and fit-for-purpose throughout the project lifecycle.
Capture and apply lessons learned from previous disconnection operations to enhance planning practices and contribute to procedural improvements.
Integrate third-party schedules into the overall project plan to ensure alignment and avoid operational conflicts.
Develop, revise, and optimize integrated schedules, coding structures, and planning procedures to support the safe and efficient disconnection of FPSO systems including subsea infrastructure decontamination.
Deliver complete and timely reporting to internal and external parties, including progress updates, risk registers, and compliance documentation.
Monitor progress against the plan, track critical path activities, and provide accurate forecasting to support operational readiness.
Ensure timely and accurate input from all relevant disciplines (engineering, marine operations, logistics) is incorporated into the planning process.
Provide timely updates to the Asset on significant deviations from the plan and recommend corrective actions.
Conduct risk assessments and analyse potential deficiencies, changes, and opportunities; escalate issues and advise on mitigation strategies to ensure safe and compliant execution.
Facilitate effective communication and coordination between internal teams and external stakeholders to resolve planning and operational challenges.
Support project close-out activities, including documentation of lessons learned, ensuring continuous improvement in future operations.
Ensure optimal and timely re-planning in response to evolving project conditions or operational constraints.
Requirements
primavera
pmp
prince2
bosiet
fpso
subsea
Solid understanding of subsea systems, marine logistics, vessel coordination, and regulatory and safety compliance within offshore environments.
Flexibility to travel offshore and occasionally to our office in the Netherlands.
Excellent communication, analytical, and problem-solving skills, with the ability to engage effectively across all levels of internal and external stakeholders.
Demonstrated experience in planning and scheduling complex offshore operations, including FPSO disconnection, relocation and decommissioning activities.
Experience with Primavera planning Software
Professional certifications such as Project Management (PMP or PRINCE2), offshore safety training (e.g., BOSIET), or FPSO-specific qualifications are highly desirable.
A Bachelor’s degree in Mechanical Engineering, Marine Engineering, Offshore Engineering, Industrial Engineering, or Project Management is desirable however candidates with relevant industry experience may also be considered.
Understand and align with the asset and project plan objectives and CMS requirements, particularly those related to FPSO disconnection.