Light Grey Kablio Logo
Kablio AI
AI Turbo Recruiter
Want to hear how I work? Hit play.Kablio AI applies for you. You just show up to the interviewKablio AI helps you secure roles in construction, clean energy, facilities management, engineering, architecture, sustainability, environment and other physical world sectors.
3D Shield
Get hired, get rewarded!
Land a job through Kablio and earn a 5% salary bonus.
Exclusive benefits
5%Bonus
Aventa

Client Representative for Array Cable Installation - Offshore

Company logo
Aventa
Engineering & consulting firm delivering specialized solutions for marine energy and offshore cable projects.
Client Representative for Cables responsible for maintaining records, ensuring safety and quality compliance during seabed preparation activities for offshore wind development projects.
22d ago
Experienced (8-12 years), Junior (1-3 years), Intermediate (4-7 years)
Full Time
Grimsby, England, United Kingdom
Field
Company Size
300 Employees
Service Specialisms
Engineering
Consulting
Project Management
Technical Services
Design
Architecture
Sector Specialisms
Marine Renewable Energies
Offshore Oil & Gas
Offshore Telecom
Offshore Hydrogen Production
Blue Economy New Technologies
Offshore Wind Farm (fixed & floating)
Tidal
Wave Energy Converter
Role
What you would be doing
daily progress reports
safety walks
installation progress
risk assessments
boulder clearance
site safety

Act as the Ørsted project representative on board Boulder Clearance Vessel during seabed preparation activities

  • Attend daily meetings, toolbox talks and any other discussions to ensure that the works are being carried out in a safe manner to the required quality
  • During all defined key activities and otherwise as often as practicable be present as a witness during installation. Access all work areas provided it is safe to do so. Screen all installation progress reporting tools used by Contractor
  • Immediate reporting of any safety, quality, or procedural deviations
  • Ensure that all relevant approved procedures and risk assessments are followed by the Contractor
  • Ensure the DPRs are signed by all required parties
  • Maintain an accurate record of all installation activities on a daily basis throughout the execution phase
  • Can recommend and agree to minor changes to the various works ongoing on a daily basis
  • Participate in safety walks with HSE representatives from Ørsted and Contractor organisations
  • Ensure the Contractor proactively manages safety and quality
  • Review and understand RA/MS and QHSE documents as required before execution phase commences and keep updated on changes in the documents
  • Report on Contractor equipment upkeep/maintenance programmes
  • Prepare and distribute Daily Progress Reports (DPR) as required
  • Synergi reporting as supervised by the specific package and project from incidents and from safety walks
  • Daily recording of activities relating to seabed boulder clearance/seabed preparation (including screening boulder/debris target list/register)
What you bring
dpr/synergi
loler/cdm
stcw 2010
iosh
10+ years experience
gwo courses

Contract can be further extended if Consultants have relevant experience in Cable lay - preferred candidates

  • IT proficient (Microsoft Word, Excel and Internet); Ørsted DPR and Synergi reporting tools
  • LOLER and CDM
  • Minimum 10 years of relevant work experience as offshore client representative
  • HUET, STCW 2010, OPITO or BOSIET and EBS (STASS, HEED or EBS)
  • IOSH Managing Safely or similar HSE training
  • Minimum 5 years of relevant work experience in seabed boulder clearance/seabed preparation operations (ROV grab, PLGR, cable cutting etc.)
  • Submission of completed and signed DPR
  • GWO courses: Sea Survival, Working at Heights, First Aid, Fire Awareness, Manual Handling
  • Authority to intervene or stop the operation in case of safety, quality infringements or the procedures not being carried out as per approved RAMS
  • Marine awareness qualifications as required by the package role
  • OEUK (or equivalent) medical certificate including Chester Step
Benefits
Information not given or found
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
  • safety, quality, and procedural compliance checks during seabed boulder clearance/preparation operations
Company
Overview
Founded in 2010
Year of Establishment
The company was established in 2010 by its founders, marking the start of its journey in engineering and consulting.
2015 Expansion
Year of Service Expansion
In 2015, the company expanded its services to include full engineering capabilities for marine renewables and offshore systems.
€10M Secure
Funding Raised
In 2023, the company secured €10 million in funding, driving international growth and new service developments.
  • Began as a consulting firm sourcing top-tier engineers for energy projects.
  • Established Kraken Subsea Solutions to support marine renewables and offshore cable systems.
  • Operates from 12 offices worldwide, offering services from design to offshore installation.
  • Projects include fixed and floating offshore wind, tidal and wave energy systems, and subsea cable networks.
  • Serves clients like Total Energies, Prysmian, and RTE, specializing in cable routing, thermal analysis, and risk engineering.
  • Engineering expertise covers geotechnics, metocean studies, and subsea structures.
  • Aventa Academy (est. 2018) supports skills development in marine energy and cable technologies.
  • Combines digital innovation, such as the AJM recruitment platform, with offshore execution and engineering excellence.
Culture + Values
Environment + Sustainability
Inclusion & Diversity
Big Kablio Logo
Kablio AIIf you're someone who helps build and power the world (or dreams to), Kablio AI is your pocket-sized recruiter that gets you hired.
Copyright © 2025 Kablio