Want to hear how I work? Hit play.Find roles with Kablio AI to help build and power the world.Kablio AI helps you secure roles in construction, clean energy, facilities management, engineering, architecture, sustainability, environment and other physical world sectors.
Get hired, get rewarded!
Land a job through Kablio and earn a 5% salary bonus.
Exclusive benefits
5%Bonus
Land Assembly Assistant
Hs2 (High Speed Two) Ltd
HS2 is a major infrastructure project building a high-speed rail network across the UK.
Coordinate land assembly, data, and stakeholders to secure land for HS2 construction.
6d ago
£26,900 - £31,600
Junior (1-3 years)
Full Time
Birmingham, England, United Kingdom
Hybrid
Company Size
25,000 Employees
Service Specialisms
Construction services
Project Management
Consulting
Engineering
Design
Technical Services
Architecture
Property Development
Sector Specialisms
Track and Overhead Catenary System
Tunnel and Open Route Mechanical & Electrical Fit out and ventilation
HV Power Distribution
Telecommunications
Command Control Signalling & Traffic Management
Network Integrated Control Centre Building
Depot Construction
Railway Systems
Role
What you would be doing
register management
notice approval
data assurance
progress tracking
budget management
workshop leadership
Verify existence of undertakings and assurances in relation to advance notice of compulsory purchase and entry within the allocated contract Area
Maintain a register of all notices prepared, served and returned, for the contract area
Approve notices for entry to land for survey purposes;
Lead collaborative working with PSC to improve efficiency of process’
Actively promote and embed Equality Diversity and Inclusion (EDI) in all your work, and support and comply with all organisational initiatives, policies and procedures on EDI.
Assure referencing data provided by PSCs to support acquisition by compulsory purchase powers, possession, handback or access for surveys;
Prepare possession and acquisition notices for approval by Land Assembly, Legal and by the ILA;
Manage daily progress trackers, escalating any deliverables which have been delayed to the contractors;
Manage the day to day activities and deliveries from the PSCs with annual budget of c. £2m per Area;
Lead workshops with Area Teams, Enabling Works Contractors (EWC)/Main Works Civils Contractors (MWCC), Land Referencing Consultants (PSC), Acquisitions and Independent Land Advisor (ILA) to ensure final land acquisition boundary and land requirements are prepared and signed off;
What you bring
excel
gis
data management
land referencing
project management
stakeholder coordination
Understanding of land assembly activities and compulsory purchase;
Experience of compiling and analysing data using Excel (or equivalent), GIS and database reporting tools;
Ability to analyse and manipulate data within a Geographical Information System and digital mapping environment;
Experience of land referencing and assembly;
Knowledge of Registration of title (Land Registry).
Ability to coordinate groups of stakeholders and agree requirements;
Experience of operating within a project/programme environment.
Project management skills, to ensure deliverables are provided within agreed time, cost and quality criteria.
Understanding of compulsory purchase powers;
Knowledge of land referencing;
Data management skills, including land referencing data recording, analysis and assurance;
Benefits
Information not given or found
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
hs2 does not hold a sponsorship licence and cannot sponsor applicants.
applicants must already have the right to work in the uk.
certain time‑bound visas are not accepted.
Security clearance
pre‑employment checks include nationality & immigration status verification.
employment references will be obtained.
dbs (disclosure and barring service) check required.
financial and education checks will be carried out.
Transforming the UK’s rail network with the vision of connecting cities through high-speed rail.
Aiming to increase capacity, improve connectivity, and stimulate economic growth across the country.
Construction is underway for the first phase, connecting London to the West Midlands, with additional phases planned to reach further northern cities.
Focusing on advanced infrastructure and cutting-edge technology to deliver a future-proof transportation system.
Expected to provide significant job opportunities and create thousands of skilled roles in construction and engineering.
High-speed rail line will reduce travel times, making travel between major cities faster, greener, and more reliable.
Ambition is to deliver a world-class rail experience while supporting sustainability with energy-efficient technologies.
Represents one of Europe’s largest and most significant infrastructure projects, pushing the boundaries of engineering and design.
Culture + Values
Ensuring value for money: manage corporate costs efficiently, bear down on programme costs while protecting strategic goals
Respecting communities: be good neighbours; community engagement drives thinking, actions and decisions
Championing teamwork and collaboration: promote a ‘one team’ approach with positive relationships between HS2, suppliers and government
Creating a positive legacy for Britain: bring country closer together, boost economy, and improve lives of this and future generations
Integrity: act fairly, transparently and consistently; use powers wisely and do the right thing even in difficult circumstances
Leadership: use innovation and challenge to lead by example; set new standards for mega‑projects
Respect: understand others, recognise their value, listen, explain decisions clearly, work flexibly
Safety: make safety first consideration; care for workforce, passengers and public, speak up if something is unsafe
Environment + Sustainability
2700 Tonnes CO2
Steel Reduction Savings
Reducing steel usage saved over 2,700 tonnes of CO2 and £7 million in costs.
87000 tCO2
Curzon Street Carbon Reduction
A 55% reduction in carbon emissions achieved at Birmingham Curzon Street station design.
7M Trees
Green Corridor Planting
Planting 7 million trees and shrubs to enhance biodiversity alongside the railway.
10M Tonnes
Aggregate Transported
Transporting 10 million tonnes via 15,000 trains, reducing lorry journeys and emissions.
Target to be a net-zero carbon railway by 2035
All trains powered by 100% zero-carbon energy
Corporate net-zero for business activities from 2025
All trains powered by 100% zero-carbon energy from day one of operation
PAS 2080 accreditation for whole-life carbon management
50% reduction in carbon emissions from steel and concrete by 2030
Use of electric zero-emission machinery and solar & hydrogen welfare cabins
Curzon Street station uses solar panels and ground-source heat pumps
Inclusion & Diversity
90% Response Rate
Diverse employee engagement surveys
Bi-annual staff surveys achieved a notable 90% response rate from diverse groups, compared to an overall 84%. Results indicated increased feelings of respect and well-being among participants.
56 Nationalities
Multicultural workforce representation
The company employs individuals from 56 different nationalities, creating a vibrant and inclusive multicultural environment across global projects.
Respect Campaign led ‘Banter in the Office’ toolbox talks to clarify acceptable vs inappropriate language, delivered to over 2,000 colleagues
Reverse mentoring programme launched Sep 2022: senior leaders mentored by junior employees from under‑represented groups to inform strategy and reduce bias
Reverse mentoring feedback: "valuable outlet… share experiences as minorities" leading to real changes in company strategy, targeting undesirable behaviours
Hey there! Before you dive into all the good stuff on our site, let’s talk cookies—the digital kind. We use these little helpers to give you the best experience we can, remember your preferences, and even suggest things you might love. But don’t worry, we only use them with your permission and handle them with care.