Light Grey Kablio Logo
Kablio AI
AI Turbo Recruiter
Want to hear how I work? Hit play.Kablio AI applies for you. You just show up to the interviewKablio AI helps you secure roles in construction, clean energy, facilities management, engineering, architecture, sustainability, environment and other physical world sectors.
3D Shield
Get hired, get rewarded!
Land a job through Kablio and earn a 5% salary bonus.
Exclusive benefits
5%Bonus
Mercer Mass Timber

Preconstruction Manager

Company logo
Mercer Mass Timber
Low‑carbon manufacturer of advanced mass timber products for sustainable construction.
Lead preconstruction planning, coordination, and proposal development for mass timber projects.
4d ago
C$85,000 - C$110,000
Expert & Leadership (13+ years), Experienced (8-12 years)
Full Time
Vancouver, British Columbia, Canada
Office Full-Time
Company Size
80 Employees
Service Specialisms
Manufacturing
Construction Services
Project Management
Engineering & VDC
Sales & Business Development
Design‑assist services
Prefabrication
Logistics
Sector Specialisms
Industrial
Residential
Commercial
Institutional
Buildings
Role
What you would be doing
proposal packages
feasibility modeling
constructability review
risk mitigation
design coordination
client interaction

Reporting directly to the Senior Preconstruction Manager, the Preconstruction Manager is responsible for leading the strategic planning, technical coordination, and proposal development for mass timber projects once a lead has been developed or an RFP has been issued. This role works closely with inhouse Estimating, Engineering, Fabrication Design, Manufacturing, and Construction departments to develop competitive, risk-averse, and comprehensive project proposals. Through technical leadership and cross-functional collaboration, the Preconstruction Manager ensures that Mercer Mass Timber delivers value-driven solutions aligned with client goals and internal execution capabilities. This role is based in Vancouver, BC.

  • Prepare detailed documentation for awarded projects and lead the internal handoff process to project management and operations.
  • Represent Mercer Mass Timber in preconstruction meetings, providing technical insight, risk mitigation strategies, and system recommendations to support client decisions.
  • Coordinate delegated design and design-assist efforts between external consultants and internal technical teams.
  • Evaluate project requirements (including specifications, drawings, and scope) to inform mass timber strategies.
  • Collaborate cross-functionally to identify project risks, opportunities, and differentiators for proposed solutions.
  • Contribute to project narratives, clarifications, preliminary schedules, and material sourcing strategies.
  • Collaborate with procurement and supply chain teams to support early sourcing and advise on market conditions and escalation risks.
  • Support the development and review of contract scopes to ensure alignment with bid documents and project assumptions.
  • Mentor and support junior preconstruction staff.
  • Work with the VDC team to develop feasibility models, connection visuals, and layout documentation for design and client presentations.
  • Contribute to logistics and manufacturing planning to ensure realistic proposal timelines and installation sequences.
  • Participate in project setup activities, including schedule validation, vendor alignment, and client expectation management.
  • Lead internal preconstruction kickoff meetings to align teams on project strategy, design intent, and scope.
  • Develop comprehensive proposal packages in collaboration with Estimating, clearly articulating scope, assumptions, pricing, and technical solutions, while addressing project constraints, logistics, schedule, and coordination.
  • Lead constructability reviews and support value engineering to optimize timber design and integration.
What you bring
construction software
cost estimating
5+ years
bachelor's
problem solving
leadership
  • Proficient in construction management and scheduling software (e.g., Bluebeam, MS Project, Procore, etc.).
  • Basic understanding of contract law and project accounting.
  • Demonstrated experience as a Preconstruction Manager, Project Manager or a similar role in the commercial/industrial manufacturing industry.
  • Strong proficiency in construction cost estimating, budgeting, and scheduling.
  • A minimum of 5 years’ experience in project management, with a focus on construction projects.
  • Effective written and verbal communication skills, with the ability to interact effectively with clients, subcontractors, and stakeholders.
  • Bachelor’s degree in Engineering, Manufacturing, or Construction Management, or have over 10+ years of relevant professional experience.
  • Strong problem-solving ability and strong sense of urgency.
  • Resilience, ability, and desire to mentor, lead and grow the Mercer Mass Timber team.
Benefits

Please note that relocation assistance will not be available.

  • The salary for this position is $85,000-$110,000 and will be commensurate with education and experience.
  • Our group benefits package, which has no waiting period, includes extended health and dental benefits, in addition to a Health Care Spending Account and a fitness allowance.
  • RRSP - We provide a competitive RRSP contribution plan, with base contributions made by Mercer which can be supplemented with personal contributions matched by the company up to a certain %.
Training + Development
Information not given or found
Interview process
Information not given or found
Visa Sponsorship
Information not given or found
Security clearance
Information not given or found
Company
Overview
Founded in 2021
Company Origin
The company was established by repurposing a former CLT plant in Spokane Valley.
Acquired in 2023
Strategic Expansion
Added plants in Conway (AR) and Penticton (BC), significantly boosting CLT/glulam production capacity.
Three Factories
Manufacturing Network
Operates facilities in Spokane, Conway, and Okanagan, producing CLT, GLT, and glulam products.
Expanded in 2024
Construction Division
Established an on-site installation division to offer end-to-end project delivery services.
  • Specialists in buildings and commercial mass-timber projects, they blend manufacturing, engineering, and logistics into turnkey solutions.
  • High-profile projects include Walmart’s Bentonville campus and Theodore Roosevelt Presidential Library framing.
  • They operate North America’s largest CLT press and cutting-edge glulam CNC, enabling rapid, precise, large-scale builds.
Culture + Values
  • low‑carbon advanced manufacturer of bio‑based building materials
  • empowers communities worldwide to build beautiful, zero‑carbon timber buildings
  • people, resources, and technology combine to create built environments that inspire and enable builders, developers, and designers
  • State‑of‑the‑art automation and technology‑driven production (“one of the globe’s largest CLT presses”, “advanced manufacturing equipment”)
  • Tracking and monitoring of lamstock, glueline, panels in production, reducing waste and setting industry standard
Environment + Sustainability
96% fewer emissions
Carbon Emission Reduction
Mass timber construction reduces embodied carbon emissions compared to steel and concrete equivalents by 96%.
25–45% carbon reduction
Carbon Efficiency
Using mass timber in construction reduces embodied carbon by 25–45% compared to traditional materials like steel and concrete.
200% carbon growth
Stored Carbon Growth
Targeting a 200% increase in stored carbon in mass timber products by 2030 compared to 2024 levels.
90% renewable energy
Energy Sustainability
Aiming to source 90% of energy from renewable sources across operations by 2030.
  • Chain-of-custody certified sourcing using SFI, PEFC, FSC; EPDs include jurisdiction and watershed data
  • Mass timber construction is faster than steel/concrete
  • Mass timber products can reduce embodied carbon by 25–45% compared with steel/concrete
  • CLT office building (Google Borregas) achieved 96% fewer embodied carbon emissions vs. steel/concrete equivalent
  • Use of mass timber can reduce embodied carbon by 25–45% compared with steel/concrete
Inclusion & Diversity
Big Kablio Logo
Kablio AIIf you're someone who helps build and power the world (or dreams to), Kablio AI is your pocket-sized recruiter that gets you hired.
Copyright © 2025 Kablio