2026 Development Engineer Higher Apprentice, Customer Network Development, Warwick

Company logo
National Grid
A global utility company focused on energy infrastructure and distribution.
Design and deliver technical solutions for connecting customers to the energy network.
10 days ago ago
£31,310
Entry-level
Full Time
Warwick, England, United Kingdom
Hybrid
Company Size
23,000 Employees
Service Specialisms
Engineering
Construction
Project Management
Technical Services
Consulting
Design
Operations and Maintenance
Sector Specialisms
Energy
Electricity Transmission
Electricity Distribution
Gas Transmission
Gas Distribution
Hydrogen Transmission
Carbon Capture and Storage (CCS)
Infrastructure
Role
What you would be doing
requirement gathering
network design
data analysis
feasibility assessment
customer collaboration
project alignment
  • Collaborate with customers, project teams, and regulators to gather requirements and ensure projects stay aligned and on track.
  • Support the design of energy network connections, including electrical layouts and infrastructure planning, to meet customer needs.
  • Analyse data and assess project feasibility, helping inform smart decisions about network capacity and connection options.
  • You’ll develop well-rounded skills through practical experience.
What you bring
gcses 9-4
a-levels c+
btec level3
power engineer
uk driving licence
electrical power
  • Play a key role in connecting new customers to the energy network, while learning essential engineering and project delivery skills.
  • You will have a minimum of five GCSEs with grades 9 to 4 (A* to C), including English language.
  • Upon successful completion of your 18 month apprenticeship you will achieve a nationally recognised accredited qualification, Level 4 Electrical Power Networks Engineer.
  • You must already have a full valid UK driving license in place at the point you make your application.
  • Have or be predicted to achieve two A-Levels at grade C or above one of which must be in either Maths or Physics OR BTEC National Certificate OR Diploma Level 3 in either Electrical & Electronic Engineering or Engineering discipline at Grade Merit or Distinction.
Benefits
  • Flexible benefits including cycle to work, buy/sell holiday to name a few.
  • A permanent position upon successful completion of your Apprenticeship.
  • Opportunity to enrol in our sharesave/share incentive plans.
  • Gain hands-on experience through site visits, inspections, and solving technical challenges during the development process.
  • Pension scheme and sharesave options.
  • 26 days annual leave + statutory holidays.
Training + Development
Information not given or found
Interview process
  • assessment centres will be held between january – april 2026.
Visa Sponsorship
  • national grid does not normally sponsor uk points‑based visas; applicants must already have the right to work in the uk.
  • sponsorship may be considered in exceptional circumstances where specialist skills cannot be sourced locally.
Security clearance
Information not given or found
Company
Overview
1990 Founded
Year Established
The company was established in 1990 to deliver electricity and gas to millions of homes and businesses.
15,000 km
High-Voltage Network
Manages an extensive electricity transmission network of high-voltage lines across the UK.
  • Plays a critical role in delivering electricity and gas to millions of homes and businesses.
  • Operates in both the UK and US, ensuring safe and reliable energy distribution.
  • Deeply involved in the development of renewable energy infrastructure, including wind and solar projects.
  • Key projects include cross-border power links to improve energy security and integrating low-carbon solutions.
  • Continually innovates to meet growing energy demand while reducing environmental impact.
  • Operates in both electricity and natural gas distribution across a vast geographical area in the US.
  • Invests in sustainability initiatives and clean energy infrastructure.
Culture + Values
  • Stand up for safety every day
  • Put our customers first
  • Be inclusive, supporting and caring for each other
  • Speak up, challenge and act where something doesn’t feel right
  • Embrace the power and opportunity of diversity
  • Increase efficiency to help with customer affordability
  • Work with others to find solutions for customers
  • Commit to learning and new ideas
  • Take personal ownership for delivering results
  • Be bold and act with passion and purpose
  • Focus on progress over perfection
  • Follow the problem through to the end
Environment + Sustainability
£51B Investment
Green Infrastructure Commitment
The company has committed to investing £51 billion in green infrastructure projects by March 2029.
Net Zero 2050
Carbon Neutral Goal
Achieve net zero emissions across Scopes 1, 2, and 3 by 2050.
60% Reduction
GHG Emissions Target
Aim to reduce absolute Scope 1 and 2 GHG emissions by 60% by 2030-31 compared to the 2018-19 baseline.
99.4% Diversion
Construction Waste Management
99.4% of construction waste is diverted from landfill.
  • 37.5% reduction in absolute Scope 3 GHG emissions by 2033/34 (excluding sold electricity)
  • 100% electric light-duty fleet by 2030; transition medium/heavy-duty to zero-carbon alternatives
  • 50% reduction in absolute SF6 emissions by 2030/31
  • 20% reduction in energy consumption in flagship offices by 2030/31
  • 50% reduction in annual air-travel emissions by 2025/26 (from 2019/20 baseline), with remaining emissions offset
  • Engage top 50% of US suppliers (by emissions) and top 80% of UK suppliers to set Science-Based Targets by 2025/26
  • 17% reduction in controllable Scope 1 and 2 emissions since FY19
  • Connecting 1.35 GW of new low-carbon generation to the network in 2023-24
  • 100% renewable energy purchased for metered estate
  • 7.9% improvement in environmental value of non-operational land since FY21
  • 100% of construction projects committing to deliver 10% net gain or greater
  • Zero waste to landfill across key areas by 2026
  • Restore natural environment by 10% on UK-managed land
  • ISO 14001 integrated management system certification
Inclusion & Diversity
Ranked #1 UK
Gender Equality Ranking
Recognized as the top company in the UK and ranked globally by Equileap in 2021.
84% Score
Workforce Disclosure Initiative
Achieved an 84% score in the Workforce Disclosure Initiative in 2022, reflecting strong progress in inclusion and diversity practices.
#1 in Times Top 50
Gender Equality Employer Ranking
Named the number one employer for gender equality in the Times Top 50 Employers list for 2023.
Bloomberg Gender‑Equality Index
Index Inclusion
Included in the 2023 Bloomberg Gender‑Equality Index, recognizing commitment to transparent reporting and advancing women's equality.
  • Aspiration to be among the most inclusive, diverse and equitable companies in business
  • Embed inclusion into everything we do
  • Build a diverse and innovative green workforce for our customers
  • Deliver organisation‑wide equity through our processes
  • Use our voice, platform and influence to create dialogue and elevate issues
Big Kablio Logo
Kablio AIIf you're someone who helps build and power the world (or dreams to), Kablio AI is your pocket-sized recruiter that gets you hired.
Copyright © 2025 Kablio
2026 Development Engineer Higher Apprentice, Customer Network Development, Warwick at National Grid in Warwick, England, United Kingdom